Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> Traction <strong>Electrification</strong> System Option with Two Transformers in Sandown<br />

Substation and Two Transformers in Argo Substation<br />

NORTH METRO CORRIDOR<br />

4-CAR TRAINS AT 15 MINUTE HEADWAY<br />

END OF LINE, MP 18.0<br />

PS-6, MP 18.0<br />

162ND AVENUE<br />

SYMBOLS:<br />

TR<strong>AC</strong>TION POWER TRANSFORMER<br />

HIGH VOLTAGE CIRCUIT BREAKER<br />

AUTOTRANSFORMER<br />

SECTION INSULATOR OR OVERLAP<br />

PHASE BREAK<br />

TPS<br />

PS<br />

SW<br />

MEDIUM VOLTAGE CIRCUIT BREAKER<br />

TR<strong>AC</strong>TION POWER SUBSTATION<br />

PARALLELING STATION<br />

SWITCHING STATION<br />

NOTES:<br />

1.<br />

2.<br />

ALL HV, BUS INCOMING, FEEDER, AND CATENARY CIRCUIT BREAKERS ARE NORMALLY CLOSED.<br />

ALL BUS TIE CIRCUIT BREAKERS ARE NORMALY OPEN.<br />

PS-5, MP 11.0<br />

3. IN ORDER TO MAINTAIN CLARITY OF THE DRAWING, ONLY MAINLINE TR<strong>AC</strong>KS ARE SHOWN.<br />

YARD TR<strong>AC</strong>KS, PASSENGER STATION TR<strong>AC</strong>KS AND SIDINGS ARE NOT SHOWN.<br />

SECTION INSULATORS AND DISCONNECT SWITCHES ARE NOT SHOWN.<br />

3.<br />

SP<strong>AC</strong>E AVAILABILITY AT ALL MILE POST LOCATIONS MUST BE VERIFIED IN THE FIELD.<br />

PS-4, MP 4.0<br />

GOLD LINE<br />

2-CAR TRAINS AT 7.5 MINUTE HEADWAY<br />

ARGO<br />

SUBSTATION<br />

TPS-2, MP 2.0<br />

SANDOWN<br />

SUBSTATION<br />

TPS-1, MP 6.0<br />

EAST CORRIDOR<br />

4-CAR TRAINS AT 15 MINUTE HEADWAY<br />

PS-3, MP 11.2<br />

SW-1, MP 0.8<br />

PS-1, MP 13.1 PS-2, MP 17.5<br />

T1<br />

T2<br />

T1<br />

T2<br />

YARD AND SHOP<br />

400 kW LOAD<br />

FEEDER<br />

SYSTEM<br />

CATENARY<br />

SYSTEM<br />

END OF LINE, MP 11.2<br />

TR<strong>AC</strong>TION POWER RETURN SYSTEM - RAILS, STATIC WIRE, AND GROUND<br />

END OF LINE, MP 23.6<br />

WARD ROAD<br />

DENVER<br />

UNION<br />

STATION<br />

MP 0.0<br />

DENVER<br />

INTERNATIONAL<br />

AIRPORT<br />

02/27/2009 FRSC Page 54 of 250