24.10.2014 Views

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

9.0 CONCEPTUAL DESIGN OF THE DENVER <strong>RTD</strong> TR<strong>AC</strong>TION<br />

ELECTRIFICATION SYSTEM<br />

9.1 GENERAL<br />

Based on the traction power system study results, a conceptual design of the traction power<br />

supply and distribution system has been developed.<br />

For electrification of the three commuter rail lines, an autotransformer-fed system (ATF) has<br />

been studied. The system will operate at 2x25 kV electrification voltages, single-phase, at the<br />

commercial frequency of 60 Hz.<br />

For the East Corridor and the Gold Line, preliminary locations of the two traction power<br />

substations were selected in consultation with <strong>RTD</strong>, while the preliminary locations of the<br />

paralleling stations and the switching station were developed by FRSC. The study results<br />

enabled to confirm that the locations of substations and autotransformer paralleling stations are<br />

suitable and to propose transformer and autotransformer ratings.<br />

9.2 TR<strong>AC</strong>TION POWER SUPPLY SYSTEM<br />

9.2.1 Traction Power Substations<br />

The load-flow simulations confirmed that an autotransformer-fed system, with traction power<br />

supply system consisting of two substations, is adequate. Considering the Denver Union<br />

Station being at milepost (MP) 0.0, the substations are proposed to be located at Sandown and<br />

Argo:<br />

• Traction Power Substation TPS-1, Sandown, located at approximate MP 6.0 on the East<br />

Corridor<br />

• Traction Power Substation TPS-2, Argo, located at approximate MP 2.0 on the Gold Line<br />

The study confirmed that no substation is required for the North Metro Corridor. The North<br />

Metro Corridor will be supplied by the Argo substation.<br />

If it is possible to install two traction power transformers at both Sandown and Argo substations,<br />

it is recommended is that each substation be equipped with two continuously-rated 12.5 MVA<br />

single-phase traction power transformers. In the event that only one traction power transformer<br />

can be installed in Argo substation, it is recommended that all transformers be rated at 15 MVA.<br />

These ratings will allow for substation outage conditions, future increase in traffic density, and<br />

for unusual operating conditions, such as train bunching. The recommended overload ratings<br />

are shown in Table 4. The transformer primary windings will be connected phase-to-phase to<br />

the 115 kV transmission lines owned and operated by Xcel Energy. Connections to the utility<br />

high voltage lines are required to ensure an adequate and highly reliable power supply with low<br />

susceptibility to phase unbalance, harmonic distortion, and voltage flicker that may result from<br />

the addition of traction load. In order to limit the system unbalance, the transformer primary<br />

windings should be connected to alternate phases of the 115 kV transmission system.<br />

The transformer secondary winding will be rated at 50 kV nominal voltage and will feed the<br />

feeder/catenary distribution system. The secondary windings will be center-tapped, with the tap<br />

solidly grounded and connected to the traction power return system. Consequently, this<br />

02/27/2009 FRSC Page 28 of 250