Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

Power demand graphs for each corridor are presented in Appendices C, D, E, F, and G.<br />

8.6 AUTOTRANSFORMER POWER DEMANDS<br />

The power demands averaged over 2-hour time interval for autotransformers located in the<br />

switching station and the paralleling stations are shown in the Table 15.<br />

Table 15 - Autotransformer Power Demands – All Systems in Service, Two Transformers<br />

in Sandown Substation, Two Transformers in Argo Substation<br />

SW/AT Station Autotransformer Power Demand (MVA), 2-Hour Average<br />

SW-1, AT-1 0.3<br />

SW-2, AT-2 0.2<br />

PS-1 0.8<br />

PS-2 1.1<br />

PS-3 0.7<br />

PS-4 0.7<br />

PS-5 1.1<br />

PS-6 0.9<br />

Results for two transformers in Sandown substation, and one transformer in Argo substation are<br />

not presented, as the results are not substantially different from the results shown.<br />

Additional load-flow simulation results are presented in Appendices C, D, E, F and G.<br />

02/27/2009 FRSC Page 27 of 250