Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

Table 14 -<br />

Substation Transformer Power Demands – Sandown Substation Outage<br />

Substation<br />

Sandown<br />

Argo<br />

Substation Transformer Traction Power Demands (MVA)<br />

2 Transformers in Sandown Substation,<br />

2 Transformers in Sandown Substation,<br />

2 Transformers in Argo Substation<br />

1 Transformer in Argo Substation<br />

Transformer<br />

15-Minute Average<br />

15-Minute Average<br />

2-Hour 1-Hour<br />

1-Minute 2-Hour 1-Hour<br />

1-Minute<br />

Power Power<br />

Power Power<br />

Average Average<br />

Average Average Average<br />

Average<br />

Demand Factor<br />

Demand Factor<br />

T1 -- -- -- -- -- -- -- -- -- --<br />

T2 -- -- -- -- -- -- -- -- -- --<br />

T1 3.0 3.0 3.0 0.99 4.9 13.9 13.9 13.9 0.98 20.8<br />

T2 11.2 11.2 11.3 0.98 19.3 -- -- -- -- --<br />