24.10.2014 Views

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

Table 9 -<br />

Distribution System Impedances – Direct-Fed System<br />

Number of Tracks<br />

Catenary Resistance<br />

(Ohm/mile)<br />

Catenary Reactance (Ohm/mile)<br />

1 0.188 0.707<br />

2 0.202 0.813<br />

<strong>Simulation</strong> Period. The simulations were performed for a morning rush hour period from<br />

8:00:00 A.M. to 10:00:00 A. M. It is assumed that the evening rush-hour is the same.<br />

Power <strong>Simulation</strong> Snapshot Interval. The electrical load-flow simulations were performed in<br />

snapshot intervals of 1 second.<br />

02/27/2009 FRSC Page 22 of 250

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!