Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />

• Operations Data<br />

o Train consist sizes for each route<br />

o Train dwell times at each passenger station<br />

o Train passenger loading<br />

o Train headways<br />

The alignment and rolling stock input data are presented in Appendix B. The train consist size<br />

and passenger station dwell time for each Corridor are shown in Table 1, presented earlier in<br />

the report. The simulation snapshot interval is 1 second.<br />

6.2 TRAIN OPERATION ALONG THE COMMUTER CORRIDORS<br />

The following tables summarize the simulation results of train operation along each of the three<br />

commuter routes under investigation. The trains utilize the peak tractive effort available,<br />

maximum acceleration rate and maximum deceleration rate. Further, the trains negotiate the<br />

route gradients, comply with the speed restrictions along the routes, and stop at passenger<br />

stations for the specified dwell time.<br />

Table 5 -<br />

East Corridor Train Operation<br />

Direction of Travel<br />

Route Length<br />

Average Speed<br />

Trip Time (minutes:seconds)<br />

(miles)<br />

(mph)<br />

DUS to DIA 23.6 32:55 41.9<br />

DIA to DUS 23.6 32:52 42.0<br />

Table 6 -<br />

Gold Line Train Operation<br />

Direction of Travel<br />

Route Length<br />

Average Speed<br />

Trip Time (minutes:seconds)<br />

(miles)<br />

(mph)<br />

DUS to Ward Road 11.2 20:47 33.8<br />

Ward Road to DUS 11.2 20:43 33.8<br />

Table 7 -<br />

North Metro Corridor Train Operation<br />

Direction of Travel<br />

Route Length<br />

Average Speed<br />

Trip Time (minutes:seconds)<br />

(miles)<br />

(mph)<br />

DUS to 162 nd Avenue 18.0 27:39 40.1<br />

162 nd Avenue to DUS 18.0 27:40 40.1<br />

Additional train operation results are presented in Appendix B.<br />

02/27/2009 FRSC Page 20 of 250