Track Data For Track: Gold Line - WB MP 6_7 to 7<br />

Run File: C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo&Sandown In - AT-2MVA,1.5% SS-10MVA rev2-T.rr<br />

Distance: 2089<br />

Elevation Change: 3.5<br />

Description:<br />

Double Track Area from 360+11 to 381+00 (MP<br />

6.7 to 7.08)<br />

# Location Distance Grade Speed Stations / Events Dwell TP% Connections Comment<br />

1 36011 0 3.98 30 0<br />

2 36712 701 3.98 30 0<br />

3 36785 774 2.65 30 0<br />

4 36885 874 -0.01 30 0<br />

5 36949 938 -0.01 30 0<br />

6 36985 974 -2.67 30 0<br />

7 37085 1074 -4.00 30 0<br />

8 37329 1318 -4.00 30 0<br />

9 37436 1425 -4.00 30 0<br />

10 37748 1737 -3.12 30 0<br />

11 37814 1803 -1.35 30 0<br />

12 37881 1870 0.41 30 0<br />

13 37948 1937 1.30 30 0<br />

14 38100 2089 1.30 30 0 Double Track to Single Track<br />

28Jan2009 Track: Gold Line - WB MP 6_7 to 7