Track Data For Track: Gold Line - WB MP 1_5 to 2<br />

Run File: C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo&Sandown In - AT-2MVA,1.5% SS-10MVA rev2-T.rr<br />

Distance: 2657<br />

Elevation Change: 1.4<br />

Description:<br />

Double Track Area from 86+61 to 113+18 (MP<br />

1.5 to 2)<br />

# Location Distance Grade Speed Stations / Events Dwell TP% Connections Comment<br />

1 8661 0 1.50 70 0<br />

2 8688 27 2.50 70 0<br />

3 8872 211 3.50 70 0<br />

4 9055 394 4.00 70 0<br />

5 9330 669 2.67 70 0<br />

6 9800 1139 0.00 70 0<br />

7 9976 1315 0.00 70 0<br />

8 10186 1525 0.00 70 0<br />

9 10270 1609 -2.67 70 0<br />

10 10740 2079 -4.00 70 0<br />

11 11055 2394 -3.21 70 0<br />

12 11318 2657 -3.21 70 0 Break - Argo SS<br />