Track Data For Track: Gold Line - EB MP 2 to 1_5<br />

Run File: C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo&Sandown In - AT-2MVA,1.5% SS-10MVA rev2-T.rr<br />

Distance: 2657<br />

Elevation Change: -1.4<br />

Description:<br />

Double Track Area from 113+18 to 86+61 (MP<br />

2 to 1.5)<br />

# Location Distance Grade Speed Stations / Events Dwell TP% Connections Comment<br />

1 11318 0 3.21 70 0 Break - Argo SS<br />

2 11055 263 4.00 70 0<br />

3 10740 578 2.67 70 0<br />

4 10270 1048 0.00 70 0<br />

5 10186 1132 0.00 70 0<br />

6 9976 1342 0.00 70 0<br />

7 9800 1518 -2.67 70 0<br />

8 9330 1988 -4.00 70 0<br />

9 9055 2263 -3.50 70 0<br />

10 8872 2446 -2.50 70 0<br />

11 8688 2630 -1.50 70 0<br />

12 8661 2657 1.50 70 0<br />

28Jan2009 Track: Gold Line - EB MP 2 to 1_5