24.10.2014 Views

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Track Data For Track: East Corridor - EB DUS to 0_8<br />

Run File: C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo&Sandown In - AT-2MVA,1.5% SS-10MVA rev2-T.rr<br />

Distance: 2640<br />

Elevation Change: -6.2<br />

Description:<br />

Entire Line is double track from DUS to Airport -<br />

DUS to MP 0.8<br />

# Location Distance Grade Speed Stations / Events Dwell TP% Connections Comment<br />

1 10184 0 -0.54 15 0 Break Point for DUS<br />

2 10733 549 -0.54 15 0<br />

3 10775 591 -0.54 15 0<br />

4 11045 861 -0.54 45 0<br />

5 11145 961 -0.54 45 0<br />

6 11198 1014 -0.45 45 0<br />

7 11335 1151 -0.26 45 0<br />

8 11467 1283 -0.07 45 0<br />

9 11599 1415 0.03 45 0<br />

10 12032 1848 0.03 55 0<br />

11 12227 2043 0.03 55 0<br />

12 12502 2318 0.03 55 0<br />

13 12824 2640 0.03 55 0 Break - Phase Break<br />

28Jan2009 Track: East Corridor - EB DUS to 0_8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!