24.10.2014 Views

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

Commuter Rail AC Electrification Load-Flow Simulation Report - RTD

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Track Data For Track: East Corridor - WB MP 17_5 to 13_1<br />

Run File: C:\...\AT-2MVA,1.5% SS-10MVA\tie IB-OB\<strong>RTD</strong> - Argo&Sandown In - AT-2MVA,1.5% SS-10MVA rev2-T.rr<br />

Distance: 23232<br />

Elevation Change: 75.3<br />

Description:<br />

Entire Line is double track from DUS to Airport -<br />

MP 17.5 to 13.1<br />

# Location Distance Grade Speed Stations / Events Dwell TP% Connections Comment<br />

1 101000 0 -0.79 70 0<br />

2 100799 201 -0.75 70 0<br />

3 100667 333 -0.67 70 0<br />

4 100535 465 -0.58 70 0<br />

5 100398 602 -0.54 70 0<br />

6 98777 2223 -0.22 70 0<br />

7 98635 2365 -0.22 70 0<br />

8 98608 2392 0.44 70 0<br />

9 98444 2556 1.09 70 0<br />

10 98276 2724 1.42 70 0<br />

11 96950 4050 1.16 70 0<br />

12 96781 4219 0.66 70 0<br />

13 96618 4382 0.15 70 0<br />

14 96449 4551 -0.10 70 0<br />

15 93692 7308 -0.10 70 0<br />

16 90730 10270 -0.10 0 64th Avenue Station Option 1 35<br />

17 90630 10370 -0.10 79 0<br />

18 89701 11299 0.11 79 0<br />

19 89569 11431 0.56 79 0<br />

20 89432 11568 1.00 79 0<br />

21 89300 11700 1.21 79 0<br />

22 86950 14050 0.92 79 0<br />

23 86834 14166 0.92 79 0<br />

24 86786 14214 0.34 79 0<br />

25 86617 14383 -0.25 79 0<br />

26 86448 14552 -0.54 79 0<br />

27 85572 15428 -0.54 79 0<br />

28 85450 15550 -0.32 79 0<br />

29 85318 15682 0.13 79 0<br />

30 85181 15819 0.58 79 0<br />

31 85049 15951 0.80 79 0<br />

32 81760 19240 0.80 75 0<br />

33 81702 19298 0.74 75 0<br />

34 81570 19430 0.60 75 0<br />

35 81432 19568 0.47 75 0<br />

36 81300 19700 0.40 75 0<br />

37 81168 19832 0.40 75 0<br />

38 79093 21907 0.40 75 0<br />

39 78819 22181 0.40 75 0<br />

40 77768 23232 -0.40 75 0 PS-1 location<br />

28Jan2009 Track: East Corridor - WB MP 17_5 to 13_1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!