Commuter Rail AC Electrification Load-Flow Simulation Report - RTD
Commuter Rail AC Electrification Load-Flow Simulation Report - RTD
Commuter Rail AC Electrification Load-Flow Simulation Report - RTD
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />
Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />
Sandown TPSS out-of-service<br />
Auto-Transformer System<br />
Argo-1Xfmr & Sandown-2Xfmr<br />
AT-2MVA X-1.5%; SS-10MVA<br />
AT Power for Feeder: East Corridor - East<br />
Run Duration: 02:00:00<br />
MVA Avg MW Avg MVAR Avg<br />
1.0<br />
0.9<br />
Average Power (MW, MVA, MVAR)<br />
0.8<br />
0.7<br />
0.6<br />
0.5<br />
0.4<br />
0.3<br />
0.2<br />
0.1<br />
0.0<br />
PS-1<br />
AT Name<br />
PS-2<br />
C:\...\1tf-Argo & 2tf-Sandown\Sandown out\<strong>RTD</strong> - Sandown Out - AT-2MVA,1.5% SS-10MVA rev2-T.rr<br />
Network Type: <strong>AC</strong>; Network Is: On<br />
Run Date and Time: 18-Feb-2009 14:52:41<br />
LTK RR v13.13.0.0<br />
Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />
Sandown TPSS out-of-service<br />
Auto-Transformer System<br />
Argo-1Xfmr & Sandown-2Xfmr<br />
AT-2MVA X-1.5%; SS-10MVA<br />
AT Power for Feeder: Gold Line - West<br />
Run Duration: 02:00:00<br />
MVA Avg MW Avg MVAR Avg<br />
0.65<br />
0.60<br />
0.55<br />
Average Power (MW, MVA, MVAR)<br />
0.50<br />
0.45<br />
0.40<br />
0.35<br />
0.30<br />
0.25<br />
0.20<br />
0.15<br />
0.10<br />
0.05<br />
0.00<br />
PS-3<br />
AT Name<br />
C:\...\1tf-Argo & 2tf-Sandown\Sandown out\<strong>RTD</strong> - Sandown Out - AT-2MVA,1.5% SS-10MVA rev2-T.rr<br />
Network Type: <strong>AC</strong>; Network Is: On<br />
Run Date and Time: 18-Feb-2009 14:52:41<br />
LTK RR v13.13.0.0<br />
Figure 48 -<br />
AT Power Demands, PS-1, PS-2, PS-3 – Sandown Substation Out Of Service<br />