Commuter Rail AC Electrification Load-Flow Simulation Report - RTD
Commuter Rail AC Electrification Load-Flow Simulation Report - RTD
Commuter Rail AC Electrification Load-Flow Simulation Report - RTD
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Commuter</strong> <strong>Rail</strong> <strong>AC</strong> <strong>Electrification</strong> <strong>Load</strong>-<strong>Flow</strong> <strong>Simulation</strong> <strong>Report</strong> Revision 1<br />
Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />
Sandown TPSS out-of-service<br />
Auto-Transformer System<br />
Argo-1Xfmr & Sandown-2Xfmr<br />
AT-2MVA X-1.5%; SS-10MVA<br />
Average Power (MW, MVA, MVAR)<br />
0.23<br />
0.22<br />
0.21<br />
0.20<br />
0.19<br />
0.18<br />
0.17<br />
0.16<br />
0.15<br />
0.14<br />
0.13<br />
0.12<br />
0.11<br />
0.10<br />
0.09<br />
0.08<br />
0.07<br />
0.06<br />
0.05<br />
0.04<br />
0.03<br />
0.02<br />
0.01<br />
0.00<br />
AT Power for Feeder: EC Phase Bus 1 to T-Splice Bus 2<br />
Run Duration: 02:00:00<br />
MVA Avg MW Avg MVAR Avg<br />
Phase Brk AT-1<br />
AT Name<br />
C:\...\1tf-Argo & 2tf-Sandown\Sandown out\<strong>RTD</strong> - Sandown Out - AT-2MVA,1.5% SS-10MVA rev2-T.rr<br />
Network Type: <strong>AC</strong>; Network Is: On<br />
Run Date and Time: 18-Feb-2009 14:52:41<br />
LTK RR v13.13.0.0<br />
Denver <strong>AC</strong> <strong>Commuter</strong> <strong>Rail</strong><br />
Sandown TPSS out-of-service<br />
Auto-Transformer System<br />
Argo-1Xfmr & Sandown-2Xfmr<br />
AT-2MVA X-1.5%; SS-10MVA<br />
Average Power (MW, MVA, MVAR)<br />
0.23<br />
0.22<br />
0.21<br />
0.20<br />
0.19<br />
0.18<br />
0.17<br />
0.16<br />
0.15<br />
0.14<br />
0.13<br />
0.12<br />
0.11<br />
0.10<br />
0.09<br />
0.08<br />
0.07<br />
0.06<br />
0.05<br />
0.04<br />
0.03<br />
0.02<br />
0.01<br />
0.00<br />
AT Power for Feeder: East Corridor - West<br />
Run Duration: 02:00:00<br />
MVA Avg MW Avg MVAR Avg<br />
Phase Brk AT-2<br />
AT Name<br />
C:\...\1tf-Argo & 2tf-Sandown\Sandown out\<strong>RTD</strong> - Sandown Out - AT-2MVA,1.5% SS-10MVA rev2-T.rr<br />
Network Type: <strong>AC</strong>; Network Is: On<br />
Run Date and Time: 18-Feb-2009 14:52:41<br />
LTK RR v13.13.0.0<br />
Figure 47 -<br />
AT Power Demands, SW-1 – Sandown Substation Out Of Service<br />
02/27/2009 FRSC Page 118 of 250