of the water treatment system, installation of various electrical<br />

buildings and pipework and the assembly of numerous components.<br />

The largest crane, with a hoisting capacity of 600 tons, was<br />

brought in from Trinidad. After erecting the last heavy components<br />

to a height of over 100 m (including the blast furnace<br />

gas valves, valve platform and the highest component of the main<br />

conveyer belt, which weighed in at 100 tons), the crane was<br />

dismantled and shipped to the next construction site. After the<br />

most important equipment and piping were installed by<br />

<strong>THE</strong> <strong>ECHO</strong> 1/2006 31<br />

April/Mai 2006, electrification of the facility was successfully<br />

completed with the special involvement of the ALSTOM.<br />

The test series of the individual components and areas of the<br />

facility are currently being conducted as sequence tests. Cold<br />

commissioning and handover of the entire furnace is scheduled<br />

for July 2006.<br />

Walter Offner, Thomas Lehmann<br />

SCOPE OF SUPPLY AND SERVICES FOR CST’S<br />

BLAST FURNACE 3:<br />

>> Burdening unit<br />

>> Main conveyor belt<br />

>> Water treatment system downstream<br />

from gas cleaning system<br />

>> Dust removal system for blast furnace<br />

gas and furnace casting house<br />

>> De-dusting unit for the burdening<br />

facility<br />

>> Furnace cooling system, including<br />

cooling towers, pumps, heat<br />

exchangers and piping<br />

>> Pipe bridges and gas piping<br />

>> Electric control panels and switchboards<br />

>> Transformers<br />

>> Climate control for all areas<br />

FURNACE PROJECT KEY FIGURES<br />

>> Local orders in Brazil: ~ 150<br />

>> Concrete: ~ 36.462 m 3<br />

>> Fire-resistant material: ~ 19,850 tons<br />

>> Steelwork: ~ 8,800 tons<br />

>> Machinery/equipment: ~ 6,800 tons<br />

>> Piping material: ~ 3,600 tons<br />

>> Cabling: 500 km<br />

>> Total hours worked: 4.9 million<br />

>> Construction<br />

and assembly workers: 2,500