<strong>Drainage</strong> <strong>Design</strong> <strong>Manual</strong> for Maricopa County<br />

<strong>Hydrology</strong>: Application<br />

9.2.5 Rational Method Example<br />

A 35.06-acre mixed use residential development is planned for the tract <strong>of</strong> land as shown on Figure<br />

9.3. Off-site run<strong>of</strong>f is to be conveyed through the site in a new storm drain.<br />

Determine the 100-year, post-development peak discharge at concentration point C1 (storm<br />

drain inlet) and C2. Also determine the total required stormwater storage volume.<br />

• Time <strong>of</strong> concentration physical data for each subbasin are listed in Table 9.3.<br />

• Rainfall D-D-F statistics are listed in Table 9.1 and Table 9.4 and I-D-F statistics in<br />

Table 9.2 and Table 9.5 and on Figure 9.4 for the manual and DDMSW GIS methods<br />

<strong>of</strong> obtaining NOAA Atlas 14 data. Note that these two methods produce comparable<br />

results, but there can be inaccuracies, particularly for the shortest durations.<br />

• Resistance coefficients for the <strong>of</strong>f-site area can be characterized as moderately high<br />

for subarea S1 and moderately low for subarea S2.<br />

• Developed areas are as follows:<br />

Low Density Residential = 16.50 acres<br />

Medium Density Residential = 6.64 acres<br />

Multiple Family Residential = 8.39 acres<br />

Pavement = 3.53 acres<br />

• The maximum permissible velocity in the storm drain is 6 fps and the storm drain<br />

length = 1,653 feet.<br />

• Assume that 10 percent <strong>of</strong> the developed area will be needed for the local and collector<br />

roadway system.<br />

Table 9.3<br />

TIME OF CONCENTRATION PHYSICAL DATA<br />

Subbasin<br />

ID<br />

Flow Path Land Use Area, acres Total<br />

Length<br />

miles<br />

Slope<br />

ft/mi NHS NDR<br />

LDR<br />

(130)<br />

MDR<br />

(140)<br />

MFR<br />

(170)<br />

P<br />

(2002)<br />

<strong>Drainage</strong><br />

Area<br />

acres<br />

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)<br />

S1 0.729 473.0 54.72 11.27 0.00 0.00 0.00 0.00 65.99<br />

S2 0.337 148.9 0.00 12.60 0.00 0.00 0.00 0.00 12.60<br />

S3 0.415 72.2 0.00 11.85 0.00 0.00 8.39 0.94 21.18<br />

S4 0.341 87.9 0.00 2.07 16.50 6.64 0.00 2.59 27.80<br />

Total: 127.57<br />