Minutes of pre-bid conference and site visit - UNOPS
Minutes of pre-bid conference and site visit - UNOPS
Minutes of pre-bid conference and site visit - UNOPS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
AFGHANISTAN OPERATIONS CENTRE (AGOC)<br />
<strong>Minutes</strong><br />
<strong>of</strong><br />
<strong>pre</strong>-<strong>bid</strong> <strong>conference</strong> <strong>and</strong> <strong>site</strong> <strong>visit</strong><br />
VSU/ITB/00057362/10/021- Site utilities work at Ghazi Boys High School, Kabul,<br />
Afghanistan.<br />
Venue: Ghazi Boys High School, <strong>UNOPS</strong> AGOC Project <strong>site</strong> <strong>of</strong>fice, Kabul, Afghanistan.<br />
Date <strong>and</strong> Time: 29 September 2010, 10.00 am.<br />
Agenda:<br />
1. Introduction<br />
2. Acquaintance with the tender procedures<br />
3. Questions <strong>and</strong> answers.<br />
The following people took part from <strong>UNOPS</strong>:<br />
<strong>UNOPS</strong>:<br />
1. Shohrukh Abdulloev, VSU Procurement Officer<br />
2. Carlo Musso, VSU Project Manager<br />
3. Gurani Malla Koc, VSU Quality Assurance Engineer<br />
4. Shafiq Farukh, VSU Procurement Assistant<br />
The re<strong>pre</strong>sentatives <strong>of</strong> the following Companies took part in the <strong>pre</strong>-<strong>bid</strong> <strong>conference</strong> <strong>and</strong><br />
<strong>site</strong> <strong>visit</strong>.<br />
1. BAHCC <strong>and</strong> ARTEN JV<br />
2. BARICH CC<br />
3. EDE Const. Co<br />
4. GREENTEC<br />
5. FOCUS TRADE MARK CONSTRUCTION<br />
6. UCC<br />
7. PAAYA Const. Co<br />
8. SHAMAL Const <strong>and</strong> GEO TECHNICAL Co.<br />
9. PASARAN HAIDARY Const. Co<br />
10. HAMEED KOCHON Const. Co<br />
11. WORLD ACCES CONSTRUCTION GROUP<br />
Pre – <strong>bid</strong> meeting commenced at 10.00 am at Ghazi Boys High School, <strong>UNOPS</strong> AGOC<br />
Project <strong>site</strong> <strong>of</strong>fice, Kabul, Afghanistan.<br />
www.unops.org<br />
UNOCA Compound Jalalabad Road Industrial Zone Kabul, Afghanistan<br />
P.O Box 1772 Central Post Office, Email: agoc@unops.org, Phone: +93<br />
799 257584
AFGHANISTAN OPERATIONS CENTRE (AGOC)<br />
Carlo Musso opened the meeting <strong>and</strong> informed <strong>bid</strong>ders that the project is part <strong>of</strong> the<br />
USAID Kabul Schools Program, <strong>and</strong> that includes Site Electrical system, Site Water<br />
System, Site Sewage Treatment System <strong>and</strong> L<strong>and</strong>scaping.<br />
Shohrukh Abdulloev summarized the composition <strong>of</strong> the Bid Documents, <strong>and</strong> highlighted<br />
important sections including the following:<br />
All sections – the need to complete <strong>and</strong> submit the required documentation as per the<br />
instructions was emphasized.<br />
All sections – the need to stamp <strong>and</strong> sign every page as acknowledgement that each has<br />
been read <strong>and</strong> understood was emphasized<br />
All contractors <strong>and</strong> their sub contractors must show pro<strong>of</strong> <strong>of</strong> AISA registration.<br />
All <strong>bid</strong>ders to pay attention to clause 5.3 (Technical Evaluation Criteria) <strong>of</strong> the ITB<br />
The <strong>bid</strong>der shall provide a <strong>bid</strong> security in original <strong>and</strong> in favour <strong>of</strong> <strong>UNOPS</strong> 00057362 –<br />
Kabul Schools Programme, case No. VSU/ITB/00057362/10/021 for a value <strong>of</strong><br />
30,000.00 USD (United States Dollars Thirty Thous<strong>and</strong> only).<br />
The closing date for submission <strong>of</strong> <strong>bid</strong>s is 12 October 2010 at 11.00 am Kabul time. No<br />
late <strong>bid</strong>s will be accepted, so <strong>bid</strong>ders should allow time for traffic jams <strong>and</strong> the like when<br />
submitting <strong>bid</strong>s. No excuses will be accepted.<br />
Bids will be opened on 12 October 2010 at 11.30 am.<br />
Bids must be valid for 90 days from the <strong>bid</strong> submission closing date.<br />
Questions to be emailed to ShohrukhA@unops.org<br />
Bidder should carefully study <strong>and</strong> underst<strong>and</strong> the solicitation documents, inclusive the<br />
technical specifications, drawings, BOQ <strong>and</strong> General Conditions.<br />
Further the <strong>bid</strong>ders were able to seek clarification on the ITB <strong>and</strong> specifications.<br />
The below questions were asked <strong>and</strong> addressed by <strong>UNOPS</strong>.<br />
Question (Q) & Answers (A):<br />
Q: What is the difference between the Bid Security <strong>and</strong> the Performance Security?<br />
www.unops.org<br />
UNOCA Compound Jalalabad Road Industrial Zone Kabul, Afghanistan<br />
P.O Box 1772 Central Post Office, Email: agoc@unops.org, Phone: +93<br />
799 257584
AFGHANISTAN OPERATIONS CENTRE (AGOC)<br />
A: Bid Security is a guarantee from the <strong>bid</strong>der that in case <strong>of</strong> selection he will execute the<br />
contract <strong>and</strong> furnish a performance security, if required, within a stipulated period <strong>of</strong><br />
time. As soon as a contract has been awarded or in case <strong>of</strong> cancellation <strong>of</strong> the solicitation<br />
process, <strong>UNOPS</strong> shall return the <strong>bid</strong> Security to all <strong>bid</strong>ders.<br />
Performance security is issued after the contract is being awarded to contractor to<br />
guarantee the faithful performance <strong>of</strong> the contract.<br />
Q: If the company is a joint venture is there a requirement to provide pro<strong>of</strong> <strong>of</strong> availability<br />
<strong>of</strong> AISA for all parties?<br />
A: All contractors <strong>and</strong> their sub contractors must show pro<strong>of</strong> <strong>of</strong> AISA registration.<br />
Q: Would <strong>UNOPS</strong> consider provision <strong>of</strong> additional timing to contractor, taking note that<br />
works are going to be implemented during the winter season.<br />
A: <strong>UNOPS</strong> expects to complete the project by March 2011, therefore, as provided in the<br />
evaluation criteria the <strong>bid</strong>der must <strong>pre</strong>sent proven track record <strong>of</strong> Cold Weather concreteworking<br />
experience.<br />
Q: Where the <strong>bid</strong>ding documents should be <strong>pre</strong>sented?<br />
A: The Bid documents must be delivered to <strong>UNOPS</strong> <strong>of</strong>fice located at UNOCA<br />
Compound, Jalalabad Road, Kabul, Afghanistan. Bids must be delivered prior to the<br />
deadline <strong>of</strong> submission <strong>of</strong> <strong>bid</strong>s, which is 12 October 2010, 11.00 am Kabul time.<br />
There were no further questions asked.<br />
The meeting was closed at 12:00 am.<br />
VSU Procurement Unit<br />
www.unops.org<br />
UNOCA Compound Jalalabad Road Industrial Zone Kabul, Afghanistan<br />
P.O Box 1772 Central Post Office, Email: agoc@unops.org, Phone: +93<br />
799 257584