API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention
API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention
Training- Schedule and conduct discharge prevention briefings for your oilhandling personnel at least once a year to assure adequate understanding of the SPCC Plan for that facility Charlie Chong/ Fion Zhang
(g) Security (excluding oil production facilities). Describe in your Plan how you secure and control access to the oil handling, processing and storage areas; secure master flow and drain valves; prevent unauthorized access to starter controls on oil pumps; secure out-of-service and loading/ unloading connections of oil pipelines; and address the appropriateness of security lighting to both prevent acts of vandalism and assist in the discovery of oil discharges. (h) Facility tank car and tank truck loading/unloading rack (excluding offshore facilities). (1) Where loading/unloading rack drainage does not flow into a catchment basin or treatment facility designed to handle discharges, use a quick drainage system for tank car or tank truck loading/unloading racks. You must design any containment system to hold at least the maximum capacity of any single compartment of a tank car or tank truck loaded or unloaded at the facility. Charlie Chong/ Fion Zhang
- Page 21 and 22: (6) An adequate description of the
- Page 23 and 24: (d) Amend your Plan, if after revie
- Page 25 and 26: (f) If you appeal a decision made b
- Page 27 and 28: Discussion Topic: §112.5 Amendment
- Page 29 and 30: Amend the SPCC Plan: for your facil
- Page 31 and 32: Amend the SPCC Plan: for your facil
- Page 33 and 34: Keywords: Reviewed SPCC Plan at lea
- Page 35 and 36: §112.6 Qualified Facilities Plan R
- Page 37 and 38: Management supports Charlie Chong/
- Page 39 and 40: (2) Technical Amendments. You must
- Page 41 and 42: 111111 The template in appendix G t
- Page 43 and 44: (i) Failure analysis, in lieu of th
- Page 45 and 46: Keywords: • Drainage trench enclo
- Page 47 and 48: (b) Tier II Qualified Facilities—
- Page 49 and 50: (3) Applicable Requirements. Except
- Page 51 and 52: (4) Professional Engineer Certifica
- Page 53 and 54: (ii) As described in paragraph (b)(
- Page 55 and 56: (2) Comply with all applicable requ
- Page 57 and 58: (ii) Discharge prevention measures
- Page 59 and 60: (b) Where experience indicates a re
- Page 61 and 62: (1) For onshore facilities: (i) Dik
- Page 63 and 64: Onshore Facilities Charlie Chong/ F
- Page 65 and 66: (2) For offshore facilities: (i) (i
- Page 67 and 68: Offshore Facilities Charlie Chong/
- Page 69 and 70: (d) Provided your Plan is certified
- Page 71: (f) Personnel, training, and discha
- Page 75 and 76: Loading/unloading rack Charlie Chon
- Page 77 and 78: (i) If a field-constructed abovegro
- Page 79 and 80: (2) Alternative Requirements to Gen
- Page 81 and 82: Good Luck! Charlie Chong/ Fion Zhan
(g) Security (excluding oil production facilities). Describe in your Plan how<br />
you secure and control access to the oil handling, processing and storage<br />
areas; secure master flow and drain valves; prevent unauthorized access<br />
to starter controls on oil pumps; secure out-<strong>of</strong>-service and loading/<br />
unloading connections <strong>of</strong> oil pipelines; and address the appropriateness<br />
<strong>of</strong> security lighting to both prevent acts <strong>of</strong> vandalism and assist in the<br />
discovery <strong>of</strong> oil discharges.<br />
(h) Facility tank car and tank truck loading/unloading rack (excluding <strong>of</strong>fshore<br />
facilities).<br />
(1) Where loading/unloading rack drainage does not flow into a catchment<br />
basin or treatment facility designed to handle discharges, use a quick<br />
drainage system for tank car or tank truck loading/unloading racks. You<br />
must design any containment system to hold at least the maximum<br />
capacity <strong>of</strong> any single compartment <strong>of</strong> a tank car or tank truck<br />
loaded or unloaded at the facility.<br />
Charlie Chong/ Fion Zhang