21.10.2014 Views

API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention

API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention

API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(b) Where experience indicates a reasonable potential for equipment failure<br />

(such as loading or unloading equipment, tank overflow, rupture, or<br />

leakage, or any other equipment known to be a source <strong>of</strong> a discharge),<br />

include in your Plan a prediction <strong>of</strong> the direction, rate <strong>of</strong> flow, and total<br />

quantity <strong>of</strong> oil which could be discharged from the facility as a result <strong>of</strong><br />

each type <strong>of</strong> major equipment failure.<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!