(3) Describe in your Plan the physical layout of the facility and include a facility diagram, which must mark the location and contents of each fixed oil storage container and the storage area where mobile or portable containers are located. The facility diagram must identify the location of and mark as “exempt” underground tanks that are otherwise exempted from the requirements of this part under §112.1(d)(4). The facility diagram must also include all transfer stations and connecting pipes, including intra-facility gathering lines that are otherwise exempted from the requirements of this part under §112.1(d)(11). You must also address in your Plan: (i) The type of oil in each fixed container and its storage capacity. For mobile or portable containers, either provide the type of oil and storage capacity for each container or provide an estimate of the potential number of mobile or portable containers, the types of oil, and anticipated storage capacities; Charlie Chong/ Fion Zhang
(ii) Discharge prevention measures including procedures for routine handling of products (loading, unloading, and facility transfers, etc.); (iii) Discharge or drainage controls such as secondary containment around containers and other structures, equipment, and procedures for the control of a discharge; (iv) Countermeasures for discharge discovery, response, and cleanup (both the facility's capability and those that might be required of a contractor); (v) Methods of disposal of recovered materials in accordance with applicable legal requirements; and (vi) Contact list and phone numbers for the facility response coordinator, National Response Center, cleanup contractors with whom you have an agreement for response, and all appropriate Federal, State, and local agencies who must be contacted in case of a discharge as described in §112.1(b). Charlie Chong/ Fion Zhang
- Page 5 and 6: §112.3 Requirement to prepare and
- Page 7 and 8: Mobile or portable facility Charlie
- Page 9 and 10: Discussion Topic: Mobile or portabl
- Page 11 and 12: (3) If your farm, as defined in §1
- Page 13 and 14: SPCC Plan must be certify by: PE in
- Page 15 and 16: (2) Such certification shall in no
- Page 17 and 18: (2) If you are an owner or operator
- Page 19 and 20: [67 FR 47140, July 17, 2002, as ame
- Page 21 and 22: (6) An adequate description of the
- Page 23 and 24: (d) Amend your Plan, if after revie
- Page 25 and 26: (f) If you appeal a decision made b
- Page 27 and 28: Discussion Topic: §112.5 Amendment
- Page 29 and 30: Amend the SPCC Plan: for your facil
- Page 31 and 32: Amend the SPCC Plan: for your facil
- Page 33 and 34: Keywords: Reviewed SPCC Plan at lea
- Page 35 and 36: §112.6 Qualified Facilities Plan R
- Page 37 and 38: Management supports Charlie Chong/
- Page 39 and 40: (2) Technical Amendments. You must
- Page 41 and 42: 111111 The template in appendix G t
- Page 43 and 44: (i) Failure analysis, in lieu of th
- Page 45 and 46: Keywords: • Drainage trench enclo
- Page 47 and 48: (b) Tier II Qualified Facilities—
- Page 49 and 50: (3) Applicable Requirements. Except
- Page 51 and 52: (4) Professional Engineer Certifica
- Page 53 and 54: (ii) As described in paragraph (b)(
- Page 55: (2) Comply with all applicable requ
- Page 59 and 60: (b) Where experience indicates a re
- Page 61 and 62: (1) For onshore facilities: (i) Dik
- Page 63 and 64: Onshore Facilities Charlie Chong/ F
- Page 65 and 66: (2) For offshore facilities: (i) (i
- Page 67 and 68: Offshore Facilities Charlie Chong/
- Page 69 and 70: (d) Provided your Plan is certified
- Page 71 and 72: (f) Personnel, training, and discha
- Page 73 and 74: (g) Security (excluding oil product
- Page 75 and 76: Loading/unloading rack Charlie Chon
- Page 77 and 78: (i) If a field-constructed abovegro
- Page 79 and 80: (2) Alternative Requirements to Gen
- Page 81 and 82: Good Luck! Charlie Chong/ Fion Zhan
(ii) Discharge prevention measures including procedures for routine<br />
handling <strong>of</strong> products (loading, unloading, and facility transfers, etc.);<br />
(iii) Discharge or drainage controls such as secondary containment around<br />
containers and other structures, equipment, and procedures for the<br />
control <strong>of</strong> a discharge;<br />
(iv) Countermeasures for discharge discovery, response, and cleanup (both<br />
the facility's capability and those that might be required <strong>of</strong> a contractor);<br />
(v) Methods <strong>of</strong> disposal <strong>of</strong> recovered materials in accordance with<br />
applicable legal requirements; and<br />
(vi) Contact list and phone numbers for the facility response coordinator,<br />
National Response Center, cleanup contractors with whom you have an<br />
agreement for response, and all appropriate Federal, State, and local<br />
agencies who must be contacted in case <strong>of</strong> a discharge as described in<br />
§<strong>112</strong>.1(b).<br />