API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention
API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention
Discussion Topic: The Plan and individual(s) responsible for implementing this Plan have the approval of management, and the facility owner or operator has committed the necessary resources to fully implement this Plan. Discussion: Discuss on the important of management supports and how these commitments could be documented Charlie Chong/ Fion Zhang
(2) Technical Amendments. You must certify any technical amendments to your Plan in accordance with paragraph (a)(1) of this section when there is a change in the facility design, construction, operation, or maintenance that affects its potential for a discharge as described in §112.1(b). If the facility change results in the facility no longer meeting the Tier I qualifying criteria in §112.3(g)(1) because an individual oil storage container capacity exceeds 5,000 U.S. gallons or the facility capacity exceeds 10,000 U.S. gallons in aggregate aboveground storage capacity, within six months following preparation of the amendment, you must either: (i) Prepare and implement a Plan in accordance with §112.6(b) if you meet the Tier II qualified facility criteria in §112.3(g)(2); or (ii) Prepare and implement a Plan in accordance with the general Plan requirements in §112.7, and applicable requirements in subparts B and C, including having the Plan certified by a Professional Engineer as required under §112.3(d). Keywords: Technical Amendments affecting discharge Charlie Chong/ Fion Zhang
- Page 1 and 2: Recommended practice for basic insp
- Page 3 and 4: Pipeline Charlie Chong/ Fion Zhang
- Page 5 and 6: §112.3 Requirement to prepare and
- Page 7 and 8: Mobile or portable facility Charlie
- Page 9 and 10: Discussion Topic: Mobile or portabl
- Page 11 and 12: (3) If your farm, as defined in §1
- Page 13 and 14: SPCC Plan must be certify by: PE in
- Page 15 and 16: (2) Such certification shall in no
- Page 17 and 18: (2) If you are an owner or operator
- Page 19 and 20: [67 FR 47140, July 17, 2002, as ame
- Page 21 and 22: (6) An adequate description of the
- Page 23 and 24: (d) Amend your Plan, if after revie
- Page 25 and 26: (f) If you appeal a decision made b
- Page 27 and 28: Discussion Topic: §112.5 Amendment
- Page 29 and 30: Amend the SPCC Plan: for your facil
- Page 31 and 32: Amend the SPCC Plan: for your facil
- Page 33 and 34: Keywords: Reviewed SPCC Plan at lea
- Page 35 and 36: §112.6 Qualified Facilities Plan R
- Page 37: Management supports Charlie Chong/
- Page 41 and 42: 111111 The template in appendix G t
- Page 43 and 44: (i) Failure analysis, in lieu of th
- Page 45 and 46: Keywords: • Drainage trench enclo
- Page 47 and 48: (b) Tier II Qualified Facilities—
- Page 49 and 50: (3) Applicable Requirements. Except
- Page 51 and 52: (4) Professional Engineer Certifica
- Page 53 and 54: (ii) As described in paragraph (b)(
- Page 55 and 56: (2) Comply with all applicable requ
- Page 57 and 58: (ii) Discharge prevention measures
- Page 59 and 60: (b) Where experience indicates a re
- Page 61 and 62: (1) For onshore facilities: (i) Dik
- Page 63 and 64: Onshore Facilities Charlie Chong/ F
- Page 65 and 66: (2) For offshore facilities: (i) (i
- Page 67 and 68: Offshore Facilities Charlie Chong/
- Page 69 and 70: (d) Provided your Plan is certified
- Page 71 and 72: (f) Personnel, training, and discha
- Page 73 and 74: (g) Security (excluding oil product
- Page 75 and 76: Loading/unloading rack Charlie Chon
- Page 77 and 78: (i) If a field-constructed abovegro
- Page 79 and 80: (2) Alternative Requirements to Gen
- Page 81 and 82: Good Luck! Charlie Chong/ Fion Zhan
(2) Technical Amendments. You must certify any technical amendments to<br />
your Plan in accordance with paragraph (a)(1) <strong>of</strong> this section when there is<br />
a change in the facility design, construction, operation, or maintenance<br />
that affects its potential for a discharge as described in §<strong>112</strong>.1(b). If the<br />
facility change results in the facility no longer meeting the Tier I qualifying<br />
criteria in §<strong>112</strong>.3(g)(1) because an individual oil storage container<br />
capacity exceeds 5,000 U.S. gallons or the facility capacity exceeds<br />
10,000 U.S. gallons in aggregate aboveground storage capacity, within six<br />
months following preparation <strong>of</strong> the amendment, you must either:<br />
(i) Prepare and implement a Plan in accordance with §<strong>112</strong>.6(b) if you meet<br />
the Tier II qualified facility criteria in §<strong>112</strong>.3(g)(2); or<br />
(ii) Prepare and implement a Plan in accordance with the general Plan<br />
requirements in §<strong>112</strong>.7, and applicable requirements in subparts B and C,<br />
including having the Plan certified by a Pr<strong>of</strong>essional Engineer as required<br />
under §<strong>112</strong>.3(d).<br />
Keywords:<br />
Technical Amendments affecting discharge<br />
Charlie Chong/ Fion Zhang