API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention
API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention
(c) Except as provided in §112.6, have a Professional Engineer certify any technical amendments to your Plan in accordance with §112.3(d). [67 FR 47140, July 17, 2002, as amended at 71 FR 77291, Dec. 26, 2006; 73 FR 74301, Dec. 5, 2008; 74 FR 58809, Nov. 13, 2009] Charlie Chong/ Fion Zhang
§112.6 Qualified Facilities Plan Requirements. Qualified facilities meeting the Tier I applicability criteria in §112.3(g)(1) are subject to the requirements in paragraph (a) of this section. Qualified facilities meeting the Tier II applicability criteria in §112.3(g)(2) are subject to the requirements in paragraph (b) of this section. (a) Tier I Qualified Facilities—(1) Preparation and Self-Certification of the Plan. If you are an owner or operator of a facility that meets the Tier I qualified facility criteria in §112.3(g)(1), you must either: comply with the requirements of paragraph (a)(3) of this section; or prepare and implement a Plan meeting requirements of paragraph (b) of this section; or prepare and implement a Plan meeting the general Plan requirements in §112.7 and applicable requirements in subparts B and C, including having the Plan certified by a Professional Engineer as required under §112.3(d). If you do not follow the appendix G template, you must prepare an equivalent Plan that meets all of the applicable requirements listed in this part, and you must supplement it with a section cross-referencing the location of requirements listed in this part and the equivalent requirements in the other prevention plan. To complete the template in appendix G, you must certify that: Charlie Chong/ Fion Zhang
- Page 1 and 2: Recommended practice for basic insp
- Page 3 and 4: Pipeline Charlie Chong/ Fion Zhang
- Page 5 and 6: §112.3 Requirement to prepare and
- Page 7 and 8: Mobile or portable facility Charlie
- Page 9 and 10: Discussion Topic: Mobile or portabl
- Page 11 and 12: (3) If your farm, as defined in §1
- Page 13 and 14: SPCC Plan must be certify by: PE in
- Page 15 and 16: (2) Such certification shall in no
- Page 17 and 18: (2) If you are an owner or operator
- Page 19 and 20: [67 FR 47140, July 17, 2002, as ame
- Page 21 and 22: (6) An adequate description of the
- Page 23 and 24: (d) Amend your Plan, if after revie
- Page 25 and 26: (f) If you appeal a decision made b
- Page 27 and 28: Discussion Topic: §112.5 Amendment
- Page 29 and 30: Amend the SPCC Plan: for your facil
- Page 31 and 32: Amend the SPCC Plan: for your facil
- Page 33: Keywords: Reviewed SPCC Plan at lea
- Page 37 and 38: Management supports Charlie Chong/
- Page 39 and 40: (2) Technical Amendments. You must
- Page 41 and 42: 111111 The template in appendix G t
- Page 43 and 44: (i) Failure analysis, in lieu of th
- Page 45 and 46: Keywords: • Drainage trench enclo
- Page 47 and 48: (b) Tier II Qualified Facilities—
- Page 49 and 50: (3) Applicable Requirements. Except
- Page 51 and 52: (4) Professional Engineer Certifica
- Page 53 and 54: (ii) As described in paragraph (b)(
- Page 55 and 56: (2) Comply with all applicable requ
- Page 57 and 58: (ii) Discharge prevention measures
- Page 59 and 60: (b) Where experience indicates a re
- Page 61 and 62: (1) For onshore facilities: (i) Dik
- Page 63 and 64: Onshore Facilities Charlie Chong/ F
- Page 65 and 66: (2) For offshore facilities: (i) (i
- Page 67 and 68: Offshore Facilities Charlie Chong/
- Page 69 and 70: (d) Provided your Plan is certified
- Page 71 and 72: (f) Personnel, training, and discha
- Page 73 and 74: (g) Security (excluding oil product
- Page 75 and 76: Loading/unloading rack Charlie Chon
- Page 77 and 78: (i) If a field-constructed abovegro
- Page 79 and 80: (2) Alternative Requirements to Gen
- Page 81 and 82: Good Luck! Charlie Chong/ Fion Zhan
(c) Except as provided in §<strong>112</strong>.6, have a Pr<strong>of</strong>essional Engineer certify any<br />
technical amendments to your Plan in accordance with §<strong>112</strong>.3(d).<br />
[67 FR 471<strong>40</strong>, July 17, 2002, as amended at 71 FR 77291, Dec. 26, 2006; 73<br />
FR 74301, Dec. 5, 2008; 74 FR 58809, Nov. 13, 2009]<br />
Charlie Chong/ Fion Zhang