Amend the SPCC Plan: for your facility when there is a change in the facility design, construction, operation, or maintenance that materially affects its potential for a discharge Charlie Chong/ Fion Zhang
Amend the SPCC Plan: for your facility when there is a change in the facility design, construction, operation, or maintenance that materially affects its potential for a discharge Charlie Chong/ Fion Zhang
- Page 1 and 2: Recommended practice for basic insp
- Page 3 and 4: Pipeline Charlie Chong/ Fion Zhang
- Page 5 and 6: §112.3 Requirement to prepare and
- Page 7 and 8: Mobile or portable facility Charlie
- Page 9 and 10: Discussion Topic: Mobile or portabl
- Page 11 and 12: (3) If your farm, as defined in §1
- Page 13 and 14: SPCC Plan must be certify by: PE in
- Page 15 and 16: (2) Such certification shall in no
- Page 17 and 18: (2) If you are an owner or operator
- Page 19 and 20: [67 FR 47140, July 17, 2002, as ame
- Page 21 and 22: (6) An adequate description of the
- Page 23 and 24: (d) Amend your Plan, if after revie
- Page 25 and 26: (f) If you appeal a decision made b
- Page 27: Discussion Topic: §112.5 Amendment
- Page 31 and 32: Amend the SPCC Plan: for your facil
- Page 33 and 34: Keywords: Reviewed SPCC Plan at lea
- Page 35 and 36: §112.6 Qualified Facilities Plan R
- Page 37 and 38: Management supports Charlie Chong/
- Page 39 and 40: (2) Technical Amendments. You must
- Page 41 and 42: 111111 The template in appendix G t
- Page 43 and 44: (i) Failure analysis, in lieu of th
- Page 45 and 46: Keywords: • Drainage trench enclo
- Page 47 and 48: (b) Tier II Qualified Facilities—
- Page 49 and 50: (3) Applicable Requirements. Except
- Page 51 and 52: (4) Professional Engineer Certifica
- Page 53 and 54: (ii) As described in paragraph (b)(
- Page 55 and 56: (2) Comply with all applicable requ
- Page 57 and 58: (ii) Discharge prevention measures
- Page 59 and 60: (b) Where experience indicates a re
- Page 61 and 62: (1) For onshore facilities: (i) Dik
- Page 63 and 64: Onshore Facilities Charlie Chong/ F
- Page 65 and 66: (2) For offshore facilities: (i) (i
- Page 67 and 68: Offshore Facilities Charlie Chong/
- Page 69 and 70: (d) Provided your Plan is certified
- Page 71 and 72: (f) Personnel, training, and discha
- Page 73 and 74: (g) Security (excluding oil product
- Page 75 and 76: Loading/unloading rack Charlie Chon
- Page 77 and 78: (i) If a field-constructed abovegro
Amend the SPCC Plan: for your facility when there is a change in the facility<br />
design, construction, operation, or maintenance that materially affects its<br />
potential for a discharge<br />
Charlie Chong/ Fion Zhang