API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention
API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention API 1169-Part 40 CFR 112 Part 2 of 2-EPA Oil Pollution Prevention
(b) Take no action under this section until it applies to your facility. This section does not apply until the expiration of the time permitted for the initial preparation and implementation of the Plan under §112.3, but not including any amendments to the Plan. (c) Send to the appropriate agency or agencies in charge of oil pollution control activities in the State in which the facility is located a complete copy of all information you provided to the Regional Administrator under paragraph (a) of this section. Upon receipt of the information such State agency or agencies may conduct a review and make recommendations to the Regional Administrator as to further procedures, methods, equipment, and other requirements necessary to prevent and to contain discharges from your facility. Charlie Chong/ Fion Zhang
(d) Amend your Plan, if after review by the Regional Administrator of the information you submit under paragraph (a) of this section, or submission of information to EPA by the State agency under paragraph (c) of this section, or after on-site review of your Plan, the Regional Administrator requires that you do so. The Regional Administrator may require you to amend your Plan if he finds that it does not meet the requirements of this part or that amendment is necessary to prevent and contain discharges from your facility. Charlie Chong/ Fion Zhang
- Page 1 and 2: Recommended practice for basic insp
- Page 3 and 4: Pipeline Charlie Chong/ Fion Zhang
- Page 5 and 6: §112.3 Requirement to prepare and
- Page 7 and 8: Mobile or portable facility Charlie
- Page 9 and 10: Discussion Topic: Mobile or portabl
- Page 11 and 12: (3) If your farm, as defined in §1
- Page 13 and 14: SPCC Plan must be certify by: PE in
- Page 15 and 16: (2) Such certification shall in no
- Page 17 and 18: (2) If you are an owner or operator
- Page 19 and 20: [67 FR 47140, July 17, 2002, as ame
- Page 21: (6) An adequate description of the
- Page 25 and 26: (f) If you appeal a decision made b
- Page 27 and 28: Discussion Topic: §112.5 Amendment
- Page 29 and 30: Amend the SPCC Plan: for your facil
- Page 31 and 32: Amend the SPCC Plan: for your facil
- Page 33 and 34: Keywords: Reviewed SPCC Plan at lea
- Page 35 and 36: §112.6 Qualified Facilities Plan R
- Page 37 and 38: Management supports Charlie Chong/
- Page 39 and 40: (2) Technical Amendments. You must
- Page 41 and 42: 111111 The template in appendix G t
- Page 43 and 44: (i) Failure analysis, in lieu of th
- Page 45 and 46: Keywords: • Drainage trench enclo
- Page 47 and 48: (b) Tier II Qualified Facilities—
- Page 49 and 50: (3) Applicable Requirements. Except
- Page 51 and 52: (4) Professional Engineer Certifica
- Page 53 and 54: (ii) As described in paragraph (b)(
- Page 55 and 56: (2) Comply with all applicable requ
- Page 57 and 58: (ii) Discharge prevention measures
- Page 59 and 60: (b) Where experience indicates a re
- Page 61 and 62: (1) For onshore facilities: (i) Dik
- Page 63 and 64: Onshore Facilities Charlie Chong/ F
- Page 65 and 66: (2) For offshore facilities: (i) (i
- Page 67 and 68: Offshore Facilities Charlie Chong/
- Page 69 and 70: (d) Provided your Plan is certified
- Page 71 and 72: (f) Personnel, training, and discha
(d) Amend your Plan, if after review by the Regional Administrator <strong>of</strong> the<br />
information you submit under paragraph (a) <strong>of</strong> this section, or submission <strong>of</strong><br />
information to <strong>EPA</strong> by the State agency under paragraph (c) <strong>of</strong> this section, or<br />
after on-site review <strong>of</strong> your Plan, the Regional Administrator requires that you<br />
do so. The Regional Administrator may require you to amend your Plan if he<br />
finds that it does not meet the requirements <strong>of</strong> this part or that amendment is<br />
necessary to prevent and contain discharges from your facility.<br />
Charlie Chong/ Fion Zhang