4.0 <strong>Market</strong> <strong>Readiness</strong> Study<br />

At this stage a meeting was called by the consultant to have all steering<br />

committee members’ input and approval on the final products to be adopted<br />

based on the prioritization study for the market readiness study. Therefore the<br />

committee consulted during one full week and then provided the consultant with<br />

below scoring (Table 6). All agreed that a short-term list and a<br />

medium/intermediate list of products will be retained for further assessment<br />

based on the 8 categories identified in the above part (Table 7).<br />

Choice of products rationale: short-term products were chosen as per spend<br />

areas different categories. There was no scoring but rather a common agreement<br />

provided to the consultant from the steering committee members. Medium-term<br />

products were also chosen by the steering committee members however with a<br />

scoring methodology. Therefore the category of IT material and supply and<br />

maintenance contained different items out of which the choice fell on printers and<br />

toners since their life-cycle is relatively short and impact is felt immediately. As<br />

for paper, although not identified in the original 8 spend areas however all<br />

present members agreed that it was an interesting product to study and<br />

elaborate further.<br />

Category<br />

Scoring<br />

1<br />

Table 6 – Steering Committee Medium Term Products’ Scoring Results<br />

Scoring<br />

2<br />

Scoring<br />

3<br />

Scoring<br />

4<br />

Scoring<br />

5<br />

Scoring<br />

6<br />

Scoring<br />

7<br />

Scoring<br />

8<br />

Scoring<br />

9 Total<br />

Lighting 1 3 2 1 2 1 1 1 1 13<br />

Water Saving (Taps) 2 1 4 2 4 2 2 2 2 21<br />

Alternative Energy<br />

production 5 2 1 3 5 3 3 4 3 29<br />

Architecture 4 4 3 4 3 4 4 3 5 34<br />

Asphalt 3 5 5 5 1 4 4 5 4 36<br />

Table 7 – The final List of chosen products<br />