National Electronic Disease Surveillance System (NEDSS ...
National Electronic Disease Surveillance System (NEDSS ...
National Electronic Disease Surveillance System (NEDSS ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>NEDSS</strong> Phase II, Deliverables 1 and 2<br />
• Appropriate laboratory resources are available for implementing data exchange<br />
functionality;<br />
• DoTS can assign appropriate resources throughout duration of project; and<br />
• A suitable development / testing environment is available.<br />
Major Project Deliverables<br />
This project will produce the following milestone deliverables:<br />
Deliverable Date Medium<br />
Communication Plan (initial) 1/7/2002 - <strong>Electronic</strong> / hardcopy<br />
Laboratory Assessment Tool 1/15/2002 <strong>Electronic</strong> / hardcopy<br />
Project Plan (initial) 2/7/2002 - <strong>Electronic</strong> / hardcopy<br />
Quality Assurance Plan (initial) 2/14/2002 - <strong>Electronic</strong> / hardcopy<br />
Lab Requirements Document 2/19/2002 <strong>Electronic</strong> / hardcopy<br />
Configuration Management Document 2/14/2002 <strong>Electronic</strong> / hardcopy<br />
Requirements Specification Document 3/1/2002 <strong>Electronic</strong> / hardcopy<br />
Installation Plan Document (initial) 3/4/2002 - <strong>Electronic</strong> / hardcopy<br />
Test Plan Document (initial) 3/14/2002 - <strong>Electronic</strong> / hardcopy<br />
Acceptance Test Plan Document (initial) 3/22/2002 - <strong>Electronic</strong> / hardcopy<br />
Data Migration Plan Document 4/8/2002 <strong>Electronic</strong> / hardcopy<br />
<strong>System</strong> Logical Model Document 5/7/2002 <strong>Electronic</strong> / hardcopy<br />
Data Dictionary (initial) 5/21/2002 - <strong>Electronic</strong> / hardcopy<br />
Requirements Traceability Document 5/28/2002 <strong>Electronic</strong> / hardcopy<br />
<strong>System</strong> Design Document 6/4/2002 <strong>Electronic</strong> / hardcopy<br />
Training Plan Document (initial) 7/25/2002 - <strong>Electronic</strong> / hardcopy<br />
Operations Document 8/9/2002 <strong>Electronic</strong> / hardcopy<br />
Support Plan Document (initial) 7/12/2002 - <strong>Electronic</strong> / hardcopy<br />
Stakeholders trained in system use 8/222002 Training<br />
Technical Stakeholders trained in system maintenance 8/27/2002 Training<br />
Acceptance Test Report 8/30/2002 <strong>Electronic</strong> / hardcopy<br />
<strong>NEDSS</strong> Base <strong>System</strong> in production 9/2/2002 <strong>System</strong><br />
Review Plan and Results Document 10/17/2002 <strong>Electronic</strong> / hardcopy<br />
PHRG Page 6 of 35 September 28, 2001