B. Price Schedule:<br />
All prices/rates quoted must be exclusive of all taxes, since the United Nations, including its subsidiary organs, is exempt<br />
from taxes.<br />
Item Description of Works UOM Total Qty Total Amount<br />
AFN<br />
1 * installation of sniper Screen ( metal framed support made from<br />
2 inch zinc Pipe to<br />
a height of 2 Meter above T walls with brackets <strong>for</strong> razor wire<br />
with total length = 45 Meter<br />
** installation of sniper Screen ( existing green screen material )<br />
to a height 2 meter<br />
Lump Sum<br />
above T walls with total length = 45 Meter<br />
*** connecting existing razor wire barrier on both ends of the<br />
western wall of compound<br />
**** connecting adjacent T walls ( not all strung together just<br />
to the adjacent T walls<br />
by steel bar dia = 25 mm<br />
2 * making cooked brick wall size ( H = 3 Meter ,Width = 0.5 Meter<br />
length = 4 Meter<br />
M 3 6<br />
in vehicle lock area west side<br />
**Plastering & painting of mentioned wall both side<br />
M 2 24<br />
3<br />
* making cooked brick wall size ( H = 3 Meter ,Width = 0.5 Meter<br />
length = 2 Meter<br />
M 3 3<br />
to complete /fill the T walls Where they join the existing walls<br />
**Plastering & painting of mentioned wall both side<br />
M 2 12<br />
4<br />
re‐en<strong>for</strong>ce the base of the T walls particularly in vehicles parking<br />
area size ( L= 10 Meter )<br />
M 3 1.5<br />
width = 1 Meter thickness = 15 cm by RCC<br />
5<br />
Labours charge <strong>for</strong> stabilizing existing wire/screen ,connect and<br />
install new screen /wire<br />
Lump sum<br />
brick up wall & attach T walls<br />
6 after completion of <strong>work</strong> the area to be cleaned properly Lump sum<br />
Grand total AFN<br />
Description<br />
The required construction <strong>work</strong> must be completed no<br />
Confirmation of completion of <strong>work</strong><br />
Stamp/Sign hereafter….<br />
later than 10 days after award of purchase order.<br />
4