Support to Law & Order – Phase VI (<strong>LOTFA</strong>)<br />
…………………………………………………………………………………<br />
Request for quotation (<strong>RFQ</strong>)<br />
For Supply and installation of Partition wall and office desks (cubical office)<br />
in <strong>LOTFA</strong> office in Kabul<br />
<strong>LOTFA</strong>/MoI/<strong>RFQ</strong>/00155/2012 “<strong>Office</strong> Partitions”<br />
اعالن<br />
داوطلبي براي تهيه و نصب ديوار هاي پارتيشن از چوب و ميز هاي دفتري براي اداره لتفا<br />
Date: 30 October 2012<br />
1. The MOI/<strong>UNDP</strong> has a budget allocation for the purchase of Civil Works; and is applying some of that<br />
allocation for the purchase of Works for which this Request for Quotation is issued.<br />
2. Your quotation, must be delivered to the office of the undersigned ON OR BEFORE 10 NOVEMBER<br />
2012, 15:00 KABUL TIME. Any quotation received later than the scheduled time will be rejected and<br />
returned unopened. The envelope containing the quotation must be clearly marked QUOTATION FOR<br />
“SUPPLY AND INSTALLATION OF PARTITION WALL AND OFFICE DESKS”<br />
3. All quotations must be valid for a period of thirty (30) days from the closing date of the Request for<br />
Quotations.<br />
4. The quotation shall be completed and signed by an authorised representative of the Bidder.<br />
5. In the case of any arithmetical discrepancy between the Unit Rate and the Total Amount quoted,<br />
then the Unit Rate shall prevail both for the evaluation of quotations and for the subsequent<br />
Purchase Order.<br />
6. Depending on the final requirement, the quantities shown may increase or decrease by twenty five<br />
percent (25%) and this shall be reflected in the Purchase Order.<br />
7. There will be no public opening of quotations; the Employer is not bound to accept the lowest<br />
quotation and reserves the right to accept or reject any or all the quotations without assigning any<br />
reason whatsoever.<br />
8. If you require any clarification on the <strong>RFQ</strong> you may send us e-mail at: procurement@lotfa.org.af call<br />
by phone: 020 220 3245<br />
9. The Supplier should sign and stamp in all <strong>RFQ</strong> pages.<br />
1<br />
2<br />
3<br />
4<br />
5<br />
نهاد Procurement Unit<br />
تداركاتي<br />
Funded by<br />
تمويل كننده<br />
Procurement of<br />
تدارك براي<br />
Project number<br />
<strong>LOTFA</strong>/MOI<br />
<strong>UNDP</strong><br />
Supply and installation of Partition wall and office desk (cubical office)<br />
تهيه و نصب ديوار هاي پارتيشن و ميز هاي دفتري<br />
شماره پرو ژه<br />
Site visit<br />
Address/ Date and Time<br />
باز ديد از ساحه<br />
<strong>LOTFA</strong>/MoI/<strong>RFQ</strong>/00155/2012 “Partitions for the <strong>Office</strong>”<br />
اجباري الزمي Mandatory<br />
<strong>LOTFA</strong> <strong>Office</strong> - 05 November 2012 at 2:00pm<br />
6 Project location موقعيت <strong>LOTFA</strong> Project office, Ministry of Interior (MOI) compound, Kabul<br />
Page 1 of 11
داخل محوطه وزارت امور داخله<br />
پروژه<br />
7<br />
Submission Deadline<br />
10 November 2012, at 3:00 PM اعالن<br />
تاريخ اعتبار<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
مدت Validity of Quotation<br />
اعتبار افر<br />
Address for the<br />
Submission of bid<br />
documents<br />
ادرس براي تسلمي افر<br />
Evaluation and<br />
Minimum Eligibility<br />
Criteria<br />
30روز DAYS<br />
<strong>LOTFA</strong> Project <strong>Office</strong>, Ministry of Interior (MOI) next to the Finance<br />
building,<br />
Kabul <strong>Afghanistan</strong><br />
وزارت -<br />
امور داخله<br />
اداره لتفا جوار رياست مالي<br />
افغانستان<br />
معيار هاي تخنيكي براي ارزيابي<br />
افر ها قابل شايستگي كار<br />
<strong>RFQ</strong> Terms and<br />
Conditions<br />
كابل –<br />
It is intended that any award resulting from this <strong>RFQ</strong> will be made to the<br />
Technically Qualified and Lowest Priced Offeror.<br />
To be considered Technically Qualified, Offerors must meet the following<br />
Minimum Eligibility Criteria<br />
1. Valid Construction Licenses from ISA (please attaché a copy of<br />
كاپي جواز كار در اداره ايسا و يك جلد كاپي ) profile Licence with company<br />
فاكت شيت<br />
2. Prior experience on similar projects, complete details (name, client<br />
contact detail, please provide with copies of previous contracts)<br />
قبآل پروژه هاي مشابه را بايد انجام نموده باشد با ارايه نمودن كاپي قرار داد<br />
3. Past performance recommendations (min 2 recommendations)<br />
حد اقل دو تصديق نامه<br />
از كار هاي انجام شده<br />
شرايط خاص اين افر<br />
Bid Submission<br />
requirement<br />
1, Appendix I, drawings)<br />
1<br />
2, Appendix II Bill of Quantity<br />
2 ضميمه<br />
ضميمه اوراق تخنيكي )نقشه هاي تخنيكي<br />
لست احجام كاري<br />
نياز مندي براي تسليم دهي افر<br />
Obtaining a complete set<br />
of Bid Documents<br />
The bid should be submitted in sealed envelope<br />
Electronic submission is not acceptable.<br />
تسليمي افر از طريق ايمل قابل قبول نميباشد<br />
ادرس براي توزيع افر<br />
The <strong>RFQ</strong> Bid documents are also available at the <strong>UNDP</strong> website<br />
www.undp.org.af , ARDS website www.ards.org.af , PDT www.acci.ogr.af<br />
and www.acbar.af.org<br />
شركت هاي عالقمندكه<br />
اشتراك در پروسه دواطلبي را دارند ميتوانند كه اسناد هاي اين افر را از<br />
طريق ويب سايت هاي كه در فوق ذكر گرديده به دست<br />
Defect Liability period<br />
مدت مسوليت گيري در رفع<br />
نواقص<br />
or may be obtained from اورند<br />
the <strong>LOTFA</strong> office, MOI Compound<br />
براي يك سال بعد از تسلمي پروژه 12 months from the date of acceptance<br />
Page 2 of 11
TERMS AND CONDITIONS FOR THE PERFORMANCE OF WORKS<br />
AND PAYMENT<br />
The Terms and Conditions hereinafter may only be varied with the written agreement of the Employer<br />
and no terms and conditions put forward at any time by the Bidder shall form any part of the Contract:<br />
(a) the Bidder shall not be required to submit a performance security;<br />
(b) the performance of the Works shall be completed within [Insert a number in words and figures]<br />
weeks from the date of issue of the Purchase Order, or the signing of the contract (if applicable);<br />
(c) after completion of the Works, the Bidder shall submit the original Invoice to the Employer; the<br />
invoice shall show the cost of the Works and Taxes (If applicable) separately;<br />
(d) payment of the Invoice shall be arranged by the Employer, within thirty (30) days, but only against<br />
the Works actually completed and performed as listed in the Purchase Order;<br />
(e) the Employer may, by written notice sent to the Bidder, terminate the Purchase Order, or Contract if<br />
applicable, in whole or in part at any time for its convenience:<br />
(i) if the Bidder fails to perform any or all the works within the time period(s) specified in the Purchase<br />
Order; or<br />
(ii) if the Bidder fails to perform any other obligation(s) under the Purchase Order; or<br />
(iii) if the Bidder, in either of the above circumstances does not cure its failure within a period of three<br />
(3) calendar days after receipt of a notice of default from the Employer specifying the nature of the<br />
default(s); or<br />
(iv) if the Bidder, in the judgment of the Employer, has engaged in any corrupt or fraudulent practices<br />
in competing for or in executing the tasks under this Purchase Order; and<br />
(f) (f) The Bidder shall provide the warranty, as stipulated in the Quotation Documents, for the Works to<br />
be performed and confirm that if any defaults are detected within the warranty period in the<br />
completed works, the Bidder shall be bound to rectify the default or re-perform the works as the case<br />
may be.<br />
EVALUATION METHODOLOGY AND CRITERIA<br />
EXAMINATION OF QUOTATIONS AND DETERMINATION OF RESPONSIVENESS<br />
Prior to the detailed evaluation of Quotations, the Employer shall determine whether each Quotation:<br />
(a) meets the eligibility criteria;<br />
(b) has been properly signed;<br />
(c) is substantially responsive to the requirements of the Request for Quotations Documents.<br />
A substantially responsive Quotation is one which conforms to all the terms, conditions, and specifications<br />
of the Request for Quotations Documents, without material deviation or reservation. A material deviation<br />
or reservation is one:<br />
(a) which affects in any substantial way the scope, quality, or performance of the Works;<br />
(b) which limits in any substantial way, inconsistent with the Request for Quotations Documents,<br />
the Employer’s rights or the Bidder’s obligations under the Contract;<br />
(c) whose rectification would affect unfairly the competitive position of other bidders presenting<br />
substantially responsive quotations.<br />
Page 3 of 11
If a Quotation is not substantially responsive, it shall be rejected by the Employer, and may not<br />
subsequently be made responsive by correction or withdrawal of the nonconforming deviation or<br />
reservation.<br />
A bidder shall not be required, as a condition for award, to undertake responsibilities not stipulated in the<br />
Request for Quotations Documents, to have to change its price or otherwise modify its Quotation.<br />
CORRECTION OF ERRORS<br />
Quotations determined to be substantially responsive shall be checked by the Employer for any arithmetic<br />
errors. Errors shall be corrected by the Employer as follows:<br />
(a) where there is a discrepancy between the amounts in figures and in words, the amount in words<br />
shall govern; and<br />
(b) where there is a discrepancy between the unit rate and the line item total resulting from multiplying<br />
the unit rate by the quantity, the unit rate as quoted shall govern, unless in the opinion of the<br />
Employer there is an obviously gross misplacement of the decimal point in the unit rate, in which<br />
case the line item total as quoted shall govern, and the unit rate shall be corrected.<br />
The amount stated in the Quotation shall be adjusted by the Employer in accordance with the above<br />
procedure for the correction of errors and, with the concurrence of the Bidder, shall be considered as<br />
binding upon the Bidder.<br />
1, Appendix I, drawings<br />
Page 4 of 11
Page 5 of 11
Page 6 of 11
Page 5 of 11
Page 6 of 11
Cubical office modeling<br />
Page 7 of 11
2 Appendix II Bill of Quantity<br />
N<br />
O<br />
Bill of quantity for the Supply and installation of partition wall and office disk (cubical office)<br />
Requested Date: 25 Oct, 2012<br />
A B C D E F<br />
WORK DISCRIPTION UNIT QTY<br />
UNITCOS<br />
IN Afs<br />
Total<br />
Cost<br />
Remarks<br />
1 Supply and installation of Coffee table size (120x60)cm including<br />
lockable cabinet for more information refer to the drawings<br />
2<br />
Supply and installation of laminated plywood best quality lockable file<br />
cabinet with its all required accessories size (200x160x40)cm The<br />
quality of materials will be demonstrated during the Site visit’<br />
3 Supply and installation of Over Head file cabinet from laminated plywood<br />
best quality with its all related accessories<br />
wooden wall partition including both side laminated plywood the quality<br />
of materials will be demonstrated during the Site visit’ with its all required<br />
4<br />
accessories including 5mm double glasses, anti blast film and sliding<br />
door<br />
each 1 The quality of materials will be<br />
demonstrated during the Site visit’<br />
M 2 8.22<br />
M 28 size (30x40)cm<br />
M 2 135<br />
As per attached appendix 1 technical<br />
drawings<br />
5 Supply and installation of sound proof materials for partition wall with its<br />
all related activities for more information refer to the technical drawings<br />
6<br />
Supply and installation of roundtable meeting table with its 6 chairs the<br />
quality of materials will be demonstrated during the Site visit’<br />
M 2 135<br />
each 1<br />
The quality of materials will be<br />
demonstrated during the Site visit’<br />
7 Supply and installation of L shape manager disk with its all related<br />
accessory<br />
each 1 based on technical drawings<br />
Page 8 of 11
8<br />
Supply and installation of <strong>Office</strong> work station from laminated plywood<br />
thickness as specified in technical drawings including Glass and other<br />
required accessories for more information refer to the technical drawings<br />
M 2 25<br />
size (1.4x0.7)m; (0.85x0.7)m and the<br />
quality of materials will be<br />
demonstrated during the Site visit’<br />
Total cost for all activities<br />
Page 9 of 11