Support to Law & Order – Phase VI (<strong>LOTFA</strong>)<br />

…………………………………………………………………………………<br />

Request for quotation (<strong>RFQ</strong>)<br />

For Supply and installation of Partition wall and office desks (cubical office)<br />

in <strong>LOTFA</strong> office in Kabul<br />

<strong>LOTFA</strong>/MoI/<strong>RFQ</strong>/00155/2012 “<strong>Office</strong> Partitions”<br />

اعالن<br />

داوطلبي براي تهيه و نصب ديوار هاي پارتيشن از چوب و ميز هاي دفتري براي اداره لتفا<br />

Date: 30 October 2012<br />

1. The MOI/<strong>UNDP</strong> has a budget allocation for the purchase of Civil Works; and is applying some of that<br />

allocation for the purchase of Works for which this Request for Quotation is issued.<br />

2. Your quotation, must be delivered to the office of the undersigned ON OR BEFORE 10 NOVEMBER<br />

2012, 15:00 KABUL TIME. Any quotation received later than the scheduled time will be rejected and<br />

returned unopened. The envelope containing the quotation must be clearly marked QUOTATION FOR<br />

“SUPPLY AND INSTALLATION OF PARTITION WALL AND OFFICE DESKS”<br />

3. All quotations must be valid for a period of thirty (30) days from the closing date of the Request for<br />

Quotations.<br />

4. The quotation shall be completed and signed by an authorised representative of the Bidder.<br />

5. In the case of any arithmetical discrepancy between the Unit Rate and the Total Amount quoted,<br />

then the Unit Rate shall prevail both for the evaluation of quotations and for the subsequent<br />

Purchase Order.<br />

6. Depending on the final requirement, the quantities shown may increase or decrease by twenty five<br />

percent (25%) and this shall be reflected in the Purchase Order.<br />

7. There will be no public opening of quotations; the Employer is not bound to accept the lowest<br />

quotation and reserves the right to accept or reject any or all the quotations without assigning any<br />

reason whatsoever.<br />

8. If you require any clarification on the <strong>RFQ</strong> you may send us e-mail at: procurement@lotfa.org.af call<br />

by phone: 020 220 3245<br />

9. The Supplier should sign and stamp in all <strong>RFQ</strong> pages.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

نهاد Procurement Unit<br />

تداركاتي<br />

Funded by<br />

تمويل كننده<br />

Procurement of<br />

تدارك براي<br />

Project number<br />

<strong>LOTFA</strong>/MOI<br />

<strong>UNDP</strong><br />

Supply and installation of Partition wall and office desk (cubical office)<br />

تهيه و نصب ديوار هاي پارتيشن و ميز هاي دفتري<br />

شماره پرو ژه<br />

Site visit<br />

Address/ Date and Time<br />

باز ديد از ساحه<br />

<strong>LOTFA</strong>/MoI/<strong>RFQ</strong>/00155/2012 “Partitions for the <strong>Office</strong>”<br />

اجباري الزمي Mandatory<br />

<strong>LOTFA</strong> <strong>Office</strong> - 05 November 2012 at 2:00pm<br />

6 Project location موقعيت <strong>LOTFA</strong> Project office, Ministry of Interior (MOI) compound, Kabul<br />

Page 1 of 11


داخل محوطه وزارت امور داخله<br />

پروژه<br />

7<br />

Submission Deadline<br />

10 November 2012, at 3:00 PM اعالن<br />

تاريخ اعتبار<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

مدت Validity of Quotation<br />

اعتبار افر<br />

Address for the<br />

Submission of bid<br />

documents<br />

ادرس براي تسلمي افر<br />

Evaluation and<br />

Minimum Eligibility<br />

Criteria<br />

‎30‎روز DAYS<br />

<strong>LOTFA</strong> Project <strong>Office</strong>, Ministry of Interior (MOI) next to the Finance<br />

building,<br />

Kabul <strong>Afghanistan</strong><br />

وزارت -<br />

امور داخله<br />

اداره لتفا جوار رياست مالي<br />

افغانستان<br />

معيار هاي تخنيكي براي ارزيابي<br />

افر ها قابل شايستگي كار<br />

<strong>RFQ</strong> Terms and<br />

Conditions<br />

كابل –<br />

It is intended that any award resulting from this <strong>RFQ</strong> will be made to the<br />

Technically Qualified and Lowest Priced Offeror.<br />

To be considered Technically Qualified, Offerors must meet the following<br />

Minimum Eligibility Criteria<br />

1. Valid Construction Licenses from ISA (please attaché a copy of<br />

كاپي جواز كار در اداره ايسا و يك جلد كاپي ) profile Licence with company<br />

فاكت شيت<br />

2. Prior experience on similar projects, complete details (name, client<br />

contact detail, please provide with copies of previous contracts)<br />

قبآل پروژه هاي مشابه را بايد انجام نموده باشد با ارايه نمودن كاپي قرار داد<br />

3. Past performance recommendations (min 2 recommendations)<br />

حد اقل دو تصديق نامه<br />

از كار هاي انجام شده<br />

شرايط خاص اين افر<br />

Bid Submission<br />

requirement<br />

1, Appendix I, drawings)<br />

1<br />

2, Appendix II Bill of Quantity<br />

2 ضميمه<br />

ضميمه اوراق تخنيكي ‏)نقشه هاي تخنيكي<br />

لست احجام كاري<br />

نياز مندي براي تسليم دهي افر<br />

Obtaining a complete set<br />

of Bid Documents<br />

The bid should be submitted in sealed envelope<br />

Electronic submission is not acceptable.<br />

تسليمي افر از طريق ايمل قابل قبول نميباشد<br />

ادرس براي توزيع افر<br />

The <strong>RFQ</strong> Bid documents are also available at the <strong>UNDP</strong> website<br />

www.undp.org.af , ARDS website www.ards.org.af , PDT www.acci.ogr.af<br />

and www.acbar.af.org<br />

شركت هاي عالقمندكه<br />

اشتراك در پروسه دواطلبي را دارند ميتوانند كه اسناد هاي اين افر را از<br />

طريق ويب سايت هاي كه در فوق ذكر گرديده به دست<br />

Defect Liability period<br />

مدت مسوليت گيري در رفع<br />

نواقص<br />

or may be obtained from اورند<br />

the <strong>LOTFA</strong> office, MOI Compound<br />

براي يك سال بعد از تسلمي پروژه 12 months from the date of acceptance<br />

Page 2 of 11


TERMS AND CONDITIONS FOR THE PERFORMANCE OF WORKS<br />

AND PAYMENT<br />

The Terms and Conditions hereinafter may only be varied with the written agreement of the Employer<br />

and no terms and conditions put forward at any time by the Bidder shall form any part of the Contract:<br />

(a) the Bidder shall not be required to submit a performance security;<br />

(b) the performance of the Works shall be completed within [Insert a number in words and figures]<br />

weeks from the date of issue of the Purchase Order, or the signing of the contract (if applicable);<br />

(c) after completion of the Works, the Bidder shall submit the original Invoice to the Employer; the<br />

invoice shall show the cost of the Works and Taxes (If applicable) separately;<br />

(d) payment of the Invoice shall be arranged by the Employer, within thirty (30) days, but only against<br />

the Works actually completed and performed as listed in the Purchase Order;<br />

(e) the Employer may, by written notice sent to the Bidder, terminate the Purchase Order, or Contract if<br />

applicable, in whole or in part at any time for its convenience:<br />

(i) if the Bidder fails to perform any or all the works within the time period(s) specified in the Purchase<br />

Order; or<br />

(ii) if the Bidder fails to perform any other obligation(s) under the Purchase Order; or<br />

(iii) if the Bidder, in either of the above circumstances does not cure its failure within a period of three<br />

(3) calendar days after receipt of a notice of default from the Employer specifying the nature of the<br />

default(s); or<br />

(iv) if the Bidder, in the judgment of the Employer, has engaged in any corrupt or fraudulent practices<br />

in competing for or in executing the tasks under this Purchase Order; and<br />

(f) (f) The Bidder shall provide the warranty, as stipulated in the Quotation Documents, for the Works to<br />

be performed and confirm that if any defaults are detected within the warranty period in the<br />

completed works, the Bidder shall be bound to rectify the default or re-perform the works as the case<br />

may be.<br />

EVALUATION METHODOLOGY AND CRITERIA<br />

EXAMINATION OF QUOTATIONS AND DETERMINATION OF RESPONSIVENESS<br />

Prior to the detailed evaluation of Quotations, the Employer shall determine whether each Quotation:<br />

(a) meets the eligibility criteria;<br />

(b) has been properly signed;<br />

(c) is substantially responsive to the requirements of the Request for Quotations Documents.<br />

A substantially responsive Quotation is one which conforms to all the terms, conditions, and specifications<br />

of the Request for Quotations Documents, without material deviation or reservation. A material deviation<br />

or reservation is one:<br />

(a) which affects in any substantial way the scope, quality, or performance of the Works;<br />

(b) which limits in any substantial way, inconsistent with the Request for Quotations Documents,<br />

the Employer’s rights or the Bidder’s obligations under the Contract;<br />

(c) whose rectification would affect unfairly the competitive position of other bidders presenting<br />

substantially responsive quotations.<br />

Page 3 of 11


If a Quotation is not substantially responsive, it shall be rejected by the Employer, and may not<br />

subsequently be made responsive by correction or withdrawal of the nonconforming deviation or<br />

reservation.<br />

A bidder shall not be required, as a condition for award, to undertake responsibilities not stipulated in the<br />

Request for Quotations Documents, to have to change its price or otherwise modify its Quotation.<br />

CORRECTION OF ERRORS<br />

Quotations determined to be substantially responsive shall be checked by the Employer for any arithmetic<br />

errors. Errors shall be corrected by the Employer as follows:<br />

(a) where there is a discrepancy between the amounts in figures and in words, the amount in words<br />

shall govern; and<br />

(b) where there is a discrepancy between the unit rate and the line item total resulting from multiplying<br />

the unit rate by the quantity, the unit rate as quoted shall govern, unless in the opinion of the<br />

Employer there is an obviously gross misplacement of the decimal point in the unit rate, in which<br />

case the line item total as quoted shall govern, and the unit rate shall be corrected.<br />

The amount stated in the Quotation shall be adjusted by the Employer in accordance with the above<br />

procedure for the correction of errors and, with the concurrence of the Bidder, shall be considered as<br />

binding upon the Bidder.<br />

1, Appendix I, drawings<br />

Page 4 of 11


Page 5 of 11


Page 6 of 11


Page 5 of 11


Page 6 of 11


Cubical office modeling<br />

Page 7 of 11


2 Appendix II Bill of Quantity<br />

N<br />

O<br />

Bill of quantity for the Supply and installation of partition wall and office disk (cubical office)<br />

Requested Date: 25 Oct, 2012<br />

A B C D E F<br />

WORK DISCRIPTION UNIT QTY<br />

UNITCOS<br />

IN Afs<br />

Total<br />

Cost<br />

Remarks<br />

1 Supply and installation of Coffee table size (120x60)cm including<br />

lockable cabinet for more information refer to the drawings<br />

2<br />

Supply and installation of laminated plywood best quality lockable file<br />

cabinet with its all required accessories size (200x160x40)cm The<br />

quality of materials will be demonstrated during the Site visit’<br />

3 Supply and installation of Over Head file cabinet from laminated plywood<br />

best quality with its all related accessories<br />

wooden wall partition including both side laminated plywood the quality<br />

of materials will be demonstrated during the Site visit’ with its all required<br />

4<br />

accessories including 5mm double glasses, anti blast film and sliding<br />

door<br />

each 1 The quality of materials will be<br />

demonstrated during the Site visit’<br />

M 2 8.22<br />

M 28 size (30x40)cm<br />

M 2 135<br />

As per attached appendix 1 technical<br />

drawings<br />

5 Supply and installation of sound proof materials for partition wall with its<br />

all related activities for more information refer to the technical drawings<br />

6<br />

Supply and installation of roundtable meeting table with its 6 chairs the<br />

quality of materials will be demonstrated during the Site visit’<br />

M 2 135<br />

each 1<br />

The quality of materials will be<br />

demonstrated during the Site visit’<br />

7 Supply and installation of L shape manager disk with its all related<br />

accessory<br />

each 1 based on technical drawings<br />

Page 8 of 11


8<br />

Supply and installation of <strong>Office</strong> work station from laminated plywood<br />

thickness as specified in technical drawings including Glass and other<br />

required accessories for more information refer to the technical drawings<br />

M 2 25<br />

size (1.4x0.7)m; (0.85x0.7)m and the<br />

quality of materials will be<br />

demonstrated during the Site visit’<br />

Total cost for all activities<br />