19.10.2014 Views

T8 Manual - UMS

T8 Manual - UMS

T8 Manual - UMS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tensiometer <strong>T8</strong><br />

1.2 Content of delivery<br />

The delivery of a <strong>T8</strong> includes:<br />

• Tensiometer, calibrated and filled, with 8-pin plug M12/IP67, with<br />

plug cap<br />

• This manual<br />

• Plastic bottle protecting the ceramic cup (must be filled to half<br />

with water to keep the cup wet)<br />

• Rubber shaft water protection disk<br />

• Calibration certificate with each order for conversion of electrical<br />

to physical values<br />

• Refilling syringe<br />

For available accessories see chapter “Accessories”.<br />

1.3 Foreword<br />

Measuring systems must be reliable and durable and should require<br />

a minimum of maintenance to achieve target-oriented results and<br />

keep the servicing low. Moreover, the success of any technical<br />

system is directly depending on a correct operation.<br />

At the beginning of a measuring task or research project the target,<br />

all effective values and the surrounding conditions must be defined.<br />

This leads to the demands for the scientific and technical project<br />

management which describes all quality related processes and<br />

decides on the used methods, the technical and measurement tools,<br />

the verification of the results and the modeling.<br />

The continuously optimized correlation of all segments and its quality<br />

assurance are finally decisive for the success of a project.<br />

We wish you good success with your projects. Please do not hesitate<br />

to contact us for further support and information.<br />

Yours,<br />

Georg von Unold<br />

5/56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!