19.10.2014 Views

T8 Manual - UMS

T8 Manual - UMS

T8 Manual - UMS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Service and maintenance<br />

Remove the syringe. Put a drop of water on both rubber and<br />

steel tube's end. Connect both.<br />

Fig. 5.4 Downwards installation – the marked tube is the<br />

refilling tube, the unmarked tube the de-airing tube<br />

Fig. 5.5 Upwards installation – the marked tube is the<br />

de-airing tube, the unmarked tube the refilling tube<br />

39/56

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!