18.10.2014 Views

Interagency Single Engine Air Tanker Operations Guide - National ...

Interagency Single Engine Air Tanker Operations Guide - National ...

Interagency Single Engine Air Tanker Operations Guide - National ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERAGENCY SINGLE ENGINE AIR TANKER OPERATIONS GUIDE<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

27<br />

28<br />

29<br />

30<br />

31<br />

32<br />

33<br />

34<br />

35<br />

36<br />

37<br />

38<br />

39<br />

40<br />

41<br />

42<br />

43<br />

Notify fire management staff when the retardant gallons<br />

being delivered to the incident goes below 50% of the<br />

SEAT’s contracted gallons, or below 300 gallons, which<br />

ever is the greater.<br />

Remind the contractor to engage the security system that<br />

has been installed whenever the aircraft is left unattended.<br />

3. Administrative Duties.<br />

Determine the type of contract the SEAT was ordered under<br />

(<strong>National</strong> On-Call, Variable Term or Exclusive Use), and<br />

ensures compliance with contractual specifications.<br />

Complete required administrative and operational forms as<br />

required by local aviation management, and ensure that the<br />

contractor completes records and reports as required by the<br />

using agency.<br />

Ensure the official SEAT Base Operating Plan (SEAT-Plan-<br />

001) has been completed for the base, including that for<br />

remote and temporary bases. The operations plans at Large<br />

<strong>Air</strong> <strong>Tanker</strong> Bases, if they include SEAT <strong>Operations</strong>, will<br />

satisfy this requirement. The assigned SEMGs of the<br />

locations must be familiar with the plan in place.<br />

Monitor contractor personnel for compliance with flight<br />

time, driving time, and duty day limitations as contained in<br />

the procurement document, and complete cumulative logs<br />

for contractor personnel.<br />

Ensure that the SEAT Pre-Use Information and Inspection<br />

Sheet (SEAT-001) for each aircraft has been completed<br />

and/or updated. If the SEMG is unable to confirm the<br />

worksheet has been completed, the SEMG must complete<br />

the form prior to operations.<br />

Complete, or validate as applicable, the following<br />

documentation for each aircraft managed, on a daily basis<br />

regardless if any flight time has occurred<br />

o <strong>Air</strong>craft Use Report (AMD 23E)<br />

o SEAT Daily <strong>Operations</strong> Worksheet (SEAT-002)<br />

o SEAT Cost Summary Sheet (SEAT-003)<br />

o SEAT Pilot Duty Chart (SEAT-004)<br />

-9-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!