Interagency Single Engine Air Tanker Operations Guide - National ...
Interagency Single Engine Air Tanker Operations Guide - National ...
Interagency Single Engine Air Tanker Operations Guide - National ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
INTERAGENCY SINGLE ENGINE AIR TANKER OPERATIONS GUIDE<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
18<br />
19<br />
20<br />
21<br />
22<br />
23<br />
24<br />
25<br />
26<br />
27<br />
28<br />
29<br />
30<br />
31<br />
32<br />
33<br />
34<br />
35<br />
36<br />
37<br />
38<br />
39<br />
40<br />
41<br />
42<br />
43<br />
Notify fire management staff when the retardant gallons<br />
being delivered to the incident goes below 50% of the<br />
SEAT’s contracted gallons, or below 300 gallons, which<br />
ever is the greater.<br />
Remind the contractor to engage the security system that<br />
has been installed whenever the aircraft is left unattended.<br />
3. Administrative Duties.<br />
Determine the type of contract the SEAT was ordered under<br />
(<strong>National</strong> On-Call, Variable Term or Exclusive Use), and<br />
ensures compliance with contractual specifications.<br />
Complete required administrative and operational forms as<br />
required by local aviation management, and ensure that the<br />
contractor completes records and reports as required by the<br />
using agency.<br />
Ensure the official SEAT Base Operating Plan (SEAT-Plan-<br />
001) has been completed for the base, including that for<br />
remote and temporary bases. The operations plans at Large<br />
<strong>Air</strong> <strong>Tanker</strong> Bases, if they include SEAT <strong>Operations</strong>, will<br />
satisfy this requirement. The assigned SEMGs of the<br />
locations must be familiar with the plan in place.<br />
Monitor contractor personnel for compliance with flight<br />
time, driving time, and duty day limitations as contained in<br />
the procurement document, and complete cumulative logs<br />
for contractor personnel.<br />
Ensure that the SEAT Pre-Use Information and Inspection<br />
Sheet (SEAT-001) for each aircraft has been completed<br />
and/or updated. If the SEMG is unable to confirm the<br />
worksheet has been completed, the SEMG must complete<br />
the form prior to operations.<br />
Complete, or validate as applicable, the following<br />
documentation for each aircraft managed, on a daily basis<br />
regardless if any flight time has occurred<br />
o <strong>Air</strong>craft Use Report (AMD 23E)<br />
o SEAT Daily <strong>Operations</strong> Worksheet (SEAT-002)<br />
o SEAT Cost Summary Sheet (SEAT-003)<br />
o SEAT Pilot Duty Chart (SEAT-004)<br />
-9-