Cost BHLS - Meeting in Zurich 9-11 May 2011<br />

Sébastien RABUEL<br />

Director of Transportation investments<br />

Nantes Métropole<br />

Chronobus program<br />

<strong>The</strong> new BHLS system in Nantes


Remember the Busway<br />

► <strong>The</strong> first BHLS <strong>concept</strong> in Nantes<br />

► <strong>The</strong> bus as the tramway : right of way, priority, stations,<br />

► High level of service : V = 20 km/h, H = 3 min, 5h – 0h30, comfor<br />

accessibility (mini-ramp)<br />

► 28 000 pass/day – 7 km<br />

► Same level of tramway (line 4)<br />

2


<strong>The</strong> <strong>CHRONOBUS</strong> <strong>concept</strong><br />

<strong>The</strong> need to find something between regular bus and tramway/busway network<br />

because :<br />

- Pb of capacity of main network / concentration at some stations (ex : Commerces)<br />

- Adapt the system to the needs and the money we get<br />

- Don’t have the space for 100% right of way (10-20 meters large)<br />

<strong>The</strong> Chronobus label will offer :<br />

A guaranteed travel time similar during and off peak hours<br />

Improved frequencies of 6 to 8 minutes during peak hours and of 10 to 12<br />

minutes off peak hours;<br />

Operating hours similar to the tram’s and BusWay’s<br />

A continuous supply throughout the year<br />

An improved accessibility for all<br />

Dedicated to lines with high potentiel (around 10 000 pass/day)<br />

3


<strong>The</strong> <strong>CHRONOBUS</strong> <strong>concept</strong><br />

To achieve the desired level of performance, the proposed developments on the<br />

Chronobus lines are made on areas where there is a risk of irregularities or faults:<br />

Positioning and accessibility of stops (stations and terminals),<br />

Bus lanes development (32 km / 68 km of 7 first Chronobus lines)<br />

Road enlargements allowing a smooth flow of the Chronobus. Occasionally, this may<br />

cause:<br />

- Transformation of angle parking into parallel parking<br />

- Removal of parking spaces.<br />

Prioritizing Chronobus at intersections (moved onto radio system)<br />

Establishment of temporary "locks" for traffic calming,<br />

Development of squares and roundabouts,<br />

<strong>The</strong>se developments systematically include the issue of soft modes (bicycles and<br />

pedestrians) and accompany behaviour changes toward a limited use of private cars in<br />

contributing to a lessening of flows and speeds on the retreated roads.<br />

4


Bus corridor<br />

EXAMPLES<br />

Crossroads treated as roundabout<br />

Traffic calming bus station<br />

5


A pragmatic approach<br />

Measures only where necessary (analysis with Optor System)<br />

6


A global approach<br />

Station apaisée<br />

<strong>CHRONOBUS</strong><br />

Couloir bus existant<br />

ou en projet<br />

Station apaisée<br />

(en ligne sur voirie)<br />

Zone à trafic limité<br />

Création de giratoire<br />

Priorité bus carrefour feux<br />

94<br />

7<br />

10


Example of a limited trafic area<br />

Chaussée réservée chronobus / modes doux / ayants droits<br />

Voie réservée chronobus / modes doux<br />

Tous modes double sens<br />

Sens unique tous modes<br />

Sens unique ayants-droit<br />

Station verrou<br />

actuelle<br />

Rue J. Verne<br />

Rue R. Coty Rue J. Moulin<br />

Rue K. Dolny<br />

Super U<br />

Rue du 8 Mai 45<br />

Rue de<br />

la Loire<br />

Mairie<br />

Rue du Petit Chassay<br />

8


A meshing network<br />

9


In addition to the 50 km of tram and BusWay network, which<br />

carries 290,000 passengers per day, the 10 Chronobus lines will<br />

transport up to 100,000 passengers.<br />

7 lines will be commissioned between September 2012 and<br />

september 2013 and the 3 remaining lines after 2014.<br />

10


1 – Introduction<br />

11


Covering the city with high level of service<br />

12


Figures<br />

Vitesse comemrciale (km/h HPS)<br />

2009 2013 Différence<br />

C1 (21) 13,7 15 1,3<br />

C2 (32) 14,6 16,5 1,9<br />

C3 (56) 14,2 15,5 1,3<br />

C4 (94) 20,8 21,5 0,7<br />

C5 (5) 14 16,4 2,4<br />

C6 (22) 14,8 18,4 3,6<br />

C7 (Est) 24,5 26,7 2,2<br />

Longueur<br />

Fréquentation (voy/jour)<br />

(km)<br />

2009 2013 Différence<br />

C1 (21) 9 14000 18300 4300<br />

C2 (32) 8 9400 11100 1700<br />

C3 (56) 10 7200 9000 1800<br />

C4 (94) 11 5300 6300 1000<br />

C5 (5) 6 1900 8200 6300<br />

C6 (22) 14 8500 14700 6200<br />

C7 (Est) 9 1800 5100 3300<br />

Total 67 48100 72700 24600<br />

13


Today<br />

Chronobus in 2015-2020-2030 mobility plan<br />

14


PDU 2010 > 2015 > 2030<br />

RÉSEAU STRUCTURANT DE TRANSPORTS COLLECTIFS – horizon 2030<br />

Chronobus in 2015-2020-2030 mobility plan<br />

Chronobus radial lines<br />

15


PDU 2010 > 2015 > 2030<br />

RÉSEAU STRUCTURANT DE TRANSPORTS COLLECTIFS – horizon 2030<br />

Ring lines<br />