The CHRONOBUS concept
The CHRONOBUS concept
The CHRONOBUS concept
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Cost BHLS - Meeting in Zurich 9-11 May 2011<br />
Sébastien RABUEL<br />
Director of Transportation investments<br />
Nantes Métropole<br />
Chronobus program<br />
<strong>The</strong> new BHLS system in Nantes
Remember the Busway<br />
► <strong>The</strong> first BHLS <strong>concept</strong> in Nantes<br />
► <strong>The</strong> bus as the tramway : right of way, priority, stations,<br />
► High level of service : V = 20 km/h, H = 3 min, 5h – 0h30, comfor<br />
accessibility (mini-ramp)<br />
► 28 000 pass/day – 7 km<br />
► Same level of tramway (line 4)<br />
2
<strong>The</strong> <strong>CHRONOBUS</strong> <strong>concept</strong><br />
<strong>The</strong> need to find something between regular bus and tramway/busway network<br />
because :<br />
- Pb of capacity of main network / concentration at some stations (ex : Commerces)<br />
- Adapt the system to the needs and the money we get<br />
- Don’t have the space for 100% right of way (10-20 meters large)<br />
<strong>The</strong> Chronobus label will offer :<br />
A guaranteed travel time similar during and off peak hours<br />
Improved frequencies of 6 to 8 minutes during peak hours and of 10 to 12<br />
minutes off peak hours;<br />
Operating hours similar to the tram’s and BusWay’s<br />
A continuous supply throughout the year<br />
An improved accessibility for all<br />
Dedicated to lines with high potentiel (around 10 000 pass/day)<br />
3
<strong>The</strong> <strong>CHRONOBUS</strong> <strong>concept</strong><br />
To achieve the desired level of performance, the proposed developments on the<br />
Chronobus lines are made on areas where there is a risk of irregularities or faults:<br />
Positioning and accessibility of stops (stations and terminals),<br />
Bus lanes development (32 km / 68 km of 7 first Chronobus lines)<br />
Road enlargements allowing a smooth flow of the Chronobus. Occasionally, this may<br />
cause:<br />
- Transformation of angle parking into parallel parking<br />
- Removal of parking spaces.<br />
Prioritizing Chronobus at intersections (moved onto radio system)<br />
Establishment of temporary "locks" for traffic calming,<br />
Development of squares and roundabouts,<br />
<strong>The</strong>se developments systematically include the issue of soft modes (bicycles and<br />
pedestrians) and accompany behaviour changes toward a limited use of private cars in<br />
contributing to a lessening of flows and speeds on the retreated roads.<br />
4
Bus corridor<br />
EXAMPLES<br />
Crossroads treated as roundabout<br />
Traffic calming bus station<br />
5
A pragmatic approach<br />
Measures only where necessary (analysis with Optor System)<br />
6
A global approach<br />
Station apaisée<br />
<strong>CHRONOBUS</strong><br />
Couloir bus existant<br />
ou en projet<br />
Station apaisée<br />
(en ligne sur voirie)<br />
Zone à trafic limité<br />
Création de giratoire<br />
Priorité bus carrefour feux<br />
94<br />
7<br />
10
Example of a limited trafic area<br />
Chaussée réservée chronobus / modes doux / ayants droits<br />
Voie réservée chronobus / modes doux<br />
Tous modes double sens<br />
Sens unique tous modes<br />
Sens unique ayants-droit<br />
Station verrou<br />
actuelle<br />
Rue J. Verne<br />
Rue R. Coty Rue J. Moulin<br />
Rue K. Dolny<br />
Super U<br />
Rue du 8 Mai 45<br />
Rue de<br />
la Loire<br />
Mairie<br />
Rue du Petit Chassay<br />
8
A meshing network<br />
9
In addition to the 50 km of tram and BusWay network, which<br />
carries 290,000 passengers per day, the 10 Chronobus lines will<br />
transport up to 100,000 passengers.<br />
7 lines will be commissioned between September 2012 and<br />
september 2013 and the 3 remaining lines after 2014.<br />
10
1 – Introduction<br />
11
Covering the city with high level of service<br />
12
Figures<br />
Vitesse comemrciale (km/h HPS)<br />
2009 2013 Différence<br />
C1 (21) 13,7 15 1,3<br />
C2 (32) 14,6 16,5 1,9<br />
C3 (56) 14,2 15,5 1,3<br />
C4 (94) 20,8 21,5 0,7<br />
C5 (5) 14 16,4 2,4<br />
C6 (22) 14,8 18,4 3,6<br />
C7 (Est) 24,5 26,7 2,2<br />
Longueur<br />
Fréquentation (voy/jour)<br />
(km)<br />
2009 2013 Différence<br />
C1 (21) 9 14000 18300 4300<br />
C2 (32) 8 9400 11100 1700<br />
C3 (56) 10 7200 9000 1800<br />
C4 (94) 11 5300 6300 1000<br />
C5 (5) 6 1900 8200 6300<br />
C6 (22) 14 8500 14700 6200<br />
C7 (Est) 9 1800 5100 3300<br />
Total 67 48100 72700 24600<br />
13
Today<br />
Chronobus in 2015-2020-2030 mobility plan<br />
14
PDU 2010 > 2015 > 2030<br />
RÉSEAU STRUCTURANT DE TRANSPORTS COLLECTIFS – horizon 2030<br />
Chronobus in 2015-2020-2030 mobility plan<br />
Chronobus radial lines<br />
15
PDU 2010 > 2015 > 2030<br />
RÉSEAU STRUCTURANT DE TRANSPORTS COLLECTIFS – horizon 2030<br />
Ring lines<br />
16
Thank you for your attention<br />
17<br />
sebastien.rabuel@nantesmetropole.fr