UDFCD <strong>BMP</strong> MONITORING SITES<br />

Pervious Concrete Pavement<br />

Typical Details<br />

Use utility vault w/<br />

lid to collect<br />

underdrains.<br />

Monolithically poured porous<br />

concrete.<br />

1in<br />

5"**<br />

D = 0.67'(8") min.**<br />

1" (min.) C-33 S<strong>and</strong><br />

6" (min.)<br />

Underdrain<br />

trench<br />

6" (min.) trench depth<br />

16 MIL (mon.) plastic impermeable membrane<br />

on top of subgrade when required <strong>and</strong> at bottom<br />

of underdrain trench.<br />

Woven geotextile fabric meeting:<br />

ASTM D4751-AOS US Std. Sieve #50 to #70,<br />

ASTM D4633 min. trapezoidal tear strength 100 x 60 lbs,<br />

Minimum COE specified open area of 4%.<br />

Section A-A<br />

** For personal vehicles & pickup trucks.<br />

Thicker section may be required for<br />

heavier vehicles.<br />

Consult with pavement engineer for<br />

needed thickness of concrete slab.<br />

*** Base course: AASHTO #67, #8 or #4 aggregate<br />

with all fractured faces.<br />

So = 0% to 2% (max.)<br />

Lmax = D/(1.5*So)<br />

A<br />

Monolithically poured porous concrete<br />

(mix of AASHTO #8 or #67 gravel<br />

<strong>and</strong> portl<strong>and</strong> cement per specifications<br />

in the <strong>BMP</strong> Details <strong>and</strong> Specifications<br />

Chapter of this Manual). No phosphorous<br />

based admixtures allowed in the PCP mix.<br />

5"**<br />

D = 0.67'(8") min.**<br />

So = 1% (min.)<br />

Install 16 MIL (min.)<br />

impermeable membrane<br />

under pipe & wrap it on d/s<br />

side to within 1in(+ 2"/-0") 1 of<br />

top of gravel to serve as<br />

horizontal flow barrier.<br />

A<br />

When certified tests show percolation rates of less than<br />

60 minutes per inch of drawdawn under the PP bottom<br />

<strong>and</strong> infiltration is allowed, eliminate the bottom s<strong>and</strong><br />

layer <strong>and</strong> underdrains.<br />

When Type C soils are present <strong>and</strong> when infiltration is<br />

allowed, unless percolations show otherwise, eliminate<br />

the bottom s<strong>and</strong> layer, use underdrains <strong>and</strong> geotextile<br />

liner instead of an impermeable one under the gravel.<br />

When the underlying soils are NRCS Type D or<br />

expansive, when existing or proposed building is within<br />

10 feet, <strong>and</strong>/or when l<strong>and</strong> uses pose risk to groundwater<br />

contamination, use 16 mil minimum thickness<br />

impermeable liner under <strong>and</strong> on sides of the pavement<br />

s<strong>and</strong> <strong>and</strong> gravel media.<br />

Pervious Concrete Pavement Section