UDFCD <strong>BMP</strong> MONITORING SITES<br />

Open Bed S<strong>and</strong> Filter<br />

Impermeable<br />

Membrane <strong>and</strong><br />

Geotextile Liners<br />

When expansive or NRCS Type D soils are present, or<br />

when st<strong>and</strong>ard percolation tests show percolation<br />

drawdown rates exceeding 60 minutes per inch, or<br />

potential for groundwater contamination exists, install a<br />

16 mil thick impermeable liner on the bottom <strong>and</strong><br />

sides of the basin. If vertical walls are permeable or of<br />

stacked blocks, extend the impermeable liner behind the<br />

walls.<br />

If soils are not expansive (i.e., NRCS Type A, B or C),<br />

use a woven geotextile material that meets the<br />

following ASTM requirements:<br />

o D-4751 – AOS U.S. Std. Sieve #50 to #70<br />

o D-4633 – Trapezoidal tear strength >= 100x60 lbs<br />

o COE specified open area >= 4%.<br />

Products meeting requirements: US Fabric US 2070 <strong>and</strong><br />

US 670, Mirafi Filterweave 500 <strong>and</strong> 700, Carthage Mills<br />

Carthage 6%.<br />

Wrap all liners to top of the s<strong>and</strong> filter basin <strong>and</strong> attach<br />

firmly with staples to the soil vertical wall using staples or<br />

concrete anchors. Provide sufficient slack so that the<br />

liners are not stretched when rock <strong>and</strong> s<strong>and</strong>/peat mix is<br />

placed. If tears are seen or discovered, repair them as<br />

recommended by manufacturer with no less than 18<br />

inches of overlap on all sides of the tear.<br />

Outlet Works<br />

When underdrains are needed, the outlet<br />

works consists of 4” perforated HDPE<br />

pipe to convey water to the overflow outlet<br />

structure. Space perforated pipe on 20 foot<br />

centers or less. At the outlet of the HDPE<br />

pipe into the box, install an orifice sized to<br />

empty the WQCV above the s<strong>and</strong> in no less<br />

than 24 hours.<br />

Provided an overflow outlet pipe out of the<br />

overflow structure to convey flows away from<br />

the filter basin when the runoff volume exceeds<br />

the WQCV at rates required by local<br />

jurisdiction to control the flood detention,<br />

typically the 10- <strong>and</strong> the 100-year storm.