BMP Monitoring Sites - Urban Drainage and Flood Control District
BMP Monitoring Sites - Urban Drainage and Flood Control District
BMP Monitoring Sites - Urban Drainage and Flood Control District
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
UDFCD <strong>BMP</strong> MONITORING SITES<br />
Open Bed S<strong>and</strong> Filter<br />
Installation Guidelines<br />
Basin Storage Volume Provide a storage volume equal to 100 percent of the<br />
WQCV based on a 40-hour drain time, above the<br />
s<strong>and</strong> bed of the basin.<br />
A. Determine the WQCV tributary catchment’s percent<br />
imperviousness. Account for the effects of DCIA or<br />
other runoff volume reducing facilities, if any, in the<br />
tributary catchments.<br />
B. Find the required storage volume (watershed inches<br />
of runoff): Determine the Required WQCV (watershed<br />
inches of runoff) based on a 40-hour drain time.<br />
C. Calculate the Design Volume in acre-feet as follows:<br />
⎛WQCV<br />
⎞<br />
DesignVolu me = ⎜ ⎟ * Area<br />
⎝ 12 ⎠<br />
In which:<br />
Area = Area tributary to the s<strong>and</strong> filter<br />
Basin Depth/Design<br />
Filter’s Surface Area<br />
Maximum depth for the Design Volume shall be 3 feet.<br />
Calculate the minimum s<strong>and</strong> filter area (As) of the basin’s<br />
bottom using:<br />
⎛ DesignVolume ⎞<br />
As = ⎜<br />
⎟ * 43,560 (square feet)<br />
⎝ 3 ⎠<br />
S<strong>and</strong> Media<br />
Provide, as a minimum, an 18-inch<br />
layer of C-33 s<strong>and</strong>. Keep the top<br />
surface flat. If side slopes need to be<br />
steeper than 3h:1v (4h:1v or flatter is<br />
preferred), use vertical walls.<br />
Granular Base <strong>and</strong><br />
Underdrains<br />
Granular material shall have all fractured<br />
faces <strong>and</strong> meet the technical requirements of AASHTO<br />
#3, #4 or #67 aggregate.