14.10.2014 Views

BMP Monitoring Sites - Urban Drainage and Flood Control District

BMP Monitoring Sites - Urban Drainage and Flood Control District

BMP Monitoring Sites - Urban Drainage and Flood Control District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UDFCD <strong>BMP</strong> MONITORING SITES<br />

Permeable Interlocking Concrete Pavement<br />

system using perforated HDPE pipe. Locate each<br />

perforated pipe just upstream of the lateral-flow cut-off<br />

barrier. Do not exceed 20-foot spacing. Use a control<br />

orifice sized to drain the pore volume of empty each cell<br />

in 6 hours or more.<br />

Design Area Ratio The design area ratio shall not exceed 2.0 (ratio =<br />

And Effective contributing impervious area/pervious pavement area).<br />

Imperviousness The interim recommendations for the Effective<br />

Imperviousness are provided in the Manual.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!