UDFCD <strong>BMP</strong> MONITORING SITES<br />

Porous Asphalt Pavement<br />

Geotextile Fabric<br />

The geotextile fabric shall be installed below the s<strong>and</strong><br />

layer. The woven fabric shall conform to the following<br />

requirements:<br />

o ASTM D 4751 – AOS U.S. STD sieve #50 to #70<br />

o ASTM D 4633 – Minimum trapezoidal tear strength<br />

100 x 60 lbs<br />

o Minimum COE specified open area of 4%<br />

Possible geotextile fabric may be US 670, Mirafi<br />

Filterweave 500, or approved equivalent.<br />

Impermeable Liner<br />

Fabric <strong>and</strong> Liner<br />

Contained Cells<br />

When expansive or NRCS Type D soils are present, or<br />

potential for groundwater contamination exists, install a<br />

16 mil impermeable<br />

liner on the bottom <strong>and</strong><br />

sides of all areas to be<br />

paved including the<br />

bottom of the underdrain<br />

trench. The impermeable<br />

liner shall be wrapped to the top of the perimeter walls<br />

<strong>and</strong> attached to the sides securely.<br />

If soils are not expansive (NRCS Types A, B or C) use<br />

woven geotextile fabric (as described above) as a liner.<br />

Place fabric <strong>and</strong> liner by rolling parallel to the contours<br />

starting at the most downstream part of the pavement.<br />

Provide a minimum of 18” overlap between adjacent<br />

sheets. Bring up geotextile fabric <strong>and</strong> impermeable liner<br />

to the top of the perimeter walls <strong>and</strong> attach with roofing<br />

tar or other adhesive or concrete anchors. Provide<br />

sufficient slack in the geotextile fabric <strong>and</strong> impermeable<br />

liner to prevent stretching during the installation of the<br />

infiltration bed, choker course <strong>and</strong> wearing course<br />

aggregate. Seal all joints of the impermeable liner to be<br />

totally leak free.<br />

Install lateral flow cut-off barriers using 16 mil or<br />

thicker PE or PVC membrane liner or concrete walls<br />

installed parallel to the contours (i.e. normal to the flow)<br />

to prevent flow of water downstream <strong>and</strong> then surfacing<br />

at the toe of the porous asphalt pavement installation.<br />

Distance (L max ) between these cut-off barriers shall not<br />

exceed: