UDFCD <strong>BMP</strong> MONITORING SITES<br />
Porous Asphalt Pavement<br />
Asphalt Test Requirement Comments<br />
Binder<br />
Downdrain<br />
(ASTM D 6390)<br />
Air Voids of<br />
Compacted Mix<br />
Cantabro<br />
Abrasion Test<br />
(unaged sample)<br />
Moisture<br />
Susceptibility by<br />
the modified<br />
Lottman method<br />
(AASHTO T 283)<br />
Resistance to<br />
Stripping by<br />
Water (ASTM D<br />
3625)<br />
0.3% Maximum Test at 15ºC<br />
higher than<br />
production<br />
temperature<br />
20% Minimum Compact using<br />
50 gyrations of<br />
Superpave<br />
gyratory<br />
compactor<br />
20% Maximum None<br />
80% Minimum<br />
Tensile Strength<br />
Ratio (TSR)<br />
95% Minimum<br />
Coating Area<br />
Only required<br />
for final mix<br />
Only required<br />
for final mix<br />
Choker Course The choker course aggregate shall be AASHTO #67<br />
Aggregate<br />
with all fractured faces. The choker<br />
course aggregate shall have a<br />
uniform thickness of 2 inches.<br />
Base Course<br />
S<strong>and</strong> Layer<br />
The base course aggregate shall be<br />
AASHTO #3 with a uniform<br />
thickness of 7 inches. The base<br />
course aggregate shall rest on top<br />
of a 1-inch thick s<strong>and</strong> cushion<br />
layer in addition to the required s<strong>and</strong> layer <strong>and</strong> on top of<br />
the geotextile fabric.<br />
The bottom s<strong>and</strong> layer shall be ASTM C-33 s<strong>and</strong> <strong>and</strong><br />
will be installed under the base course <strong>and</strong> above the<br />
underdrain trench, when one is used.