Porous Asphalt Pavement<br />
Installation Guidelines<br />
Design Thickness<br />
Asphalt Binder<br />
Design the thickness of the porous<br />
asphalt slab to have a finished<br />
thickness of 2.5 inches with a<br />
bituminous binder of 5.5% to 6.5% by<br />
weight dry aggregate.<br />
Use neat asphalt binder modified with an elastomeric<br />
polymer to produce a binder meeting the requirements of<br />
PG 76022. The elastomeric polymer shall be styrenebutadiene-styrene<br />
(SBS) or approved equivalent, applied<br />
at a rate of 3% by total weight of the binder. The<br />
composite materials shall be thoroughly blended at the<br />
asphalt refinery or terminal prior to being loaded into the<br />
transport vehicle. The polymer-modified asphalt binder<br />
shall be heat <strong>and</strong> storage stable.<br />
Aggregate Gradation Aggregate in the asphalt mix shall be a minimum 90%<br />
crushed material <strong>and</strong> have the following gradation:<br />
U.S. St<strong>and</strong>ard Sieve Size Percent Passing<br />
0.5-inch (12.5 mm) 100<br />
0.375-inch (9.5 mm) 75-95<br />
#4 (4.75 mm) 25-35<br />
#8 (2.36 mm) 10-15<br />
#16 (1.18 mm) 5-10<br />
#30 (600 µm) 1-5<br />
#200 (75 µm) 1-3<br />
Batch Testing<br />
To test draindown, air voids <strong>and</strong> abrasion, prepare<br />
three batches containing asphalt binder contents of<br />
5.5, 6.0 <strong>and</strong> 6.5 percent by dry weight aggregate. The<br />
asphalt content that provides the best results according<br />
to the following table shall be selected as the final mix.<br />
Test the final mix for Moisture Susceptibility <strong>and</strong><br />
Resistance to Stripping. If the final mix does not meet the<br />
requirements for moisture susceptibility <strong>and</strong> resistance to<br />
stripping, add hydrated lime until the requirements are<br />
met.