UDFCD <strong>BMP</strong> MONITORING SITES<br />

Porous Asphalt Pavement<br />

Installation Guidelines<br />

Design Thickness<br />

Asphalt Binder<br />

Design the thickness of the porous<br />

asphalt slab to have a finished<br />

thickness of 2.5 inches with a<br />

bituminous binder of 5.5% to 6.5% by<br />

weight dry aggregate.<br />

Use neat asphalt binder modified with an elastomeric<br />

polymer to produce a binder meeting the requirements of<br />

PG 76022. The elastomeric polymer shall be styrenebutadiene-styrene<br />

(SBS) or approved equivalent, applied<br />

at a rate of 3% by total weight of the binder. The<br />

composite materials shall be thoroughly blended at the<br />

asphalt refinery or terminal prior to being loaded into the<br />

transport vehicle. The polymer-modified asphalt binder<br />

shall be heat <strong>and</strong> storage stable.<br />

Aggregate Gradation Aggregate in the asphalt mix shall be a minimum 90%<br />

crushed material <strong>and</strong> have the following gradation:<br />

U.S. St<strong>and</strong>ard Sieve Size Percent Passing<br />

0.5-inch (12.5 mm) 100<br />

0.375-inch (9.5 mm) 75-95<br />

#4 (4.75 mm) 25-35<br />

#8 (2.36 mm) 10-15<br />

#16 (1.18 mm) 5-10<br />

#30 (600 µm) 1-5<br />

#200 (75 µm) 1-3<br />

Batch Testing<br />

To test draindown, air voids <strong>and</strong> abrasion, prepare<br />

three batches containing asphalt binder contents of<br />

5.5, 6.0 <strong>and</strong> 6.5 percent by dry weight aggregate. The<br />

asphalt content that provides the best results according<br />

to the following table shall be selected as the final mix.<br />

Test the final mix for Moisture Susceptibility <strong>and</strong><br />

Resistance to Stripping. If the final mix does not meet the<br />

requirements for moisture susceptibility <strong>and</strong> resistance to<br />

stripping, add hydrated lime until the requirements are<br />

met.