UDFCD BMP MONITORING SITES Porous Asphalt Pavement Typical Details 5.0' 20.0' 92.0' 20.0' TEMPORARY ORANGE FENCE POROUS ASPHALT 25' 18" RCP @ 1.0% INLETS: 3.5' x 2.0' DWMD BUILDING CONVENTIONAL ASPHALT Porous Asphalt Pavement Plan AASHTO #67, all fractured faces; (CDOT SECT. 703-2, #67 course aggregate) Open-Graded HMA ASTM C-33 Sand Base Course: #3 Aggregate (CDOT Section 703-2) 2% Min. 18.0" Min. 2.5" 2.0" 7.0" 1.0" 6.0" Fill under-drain trench around pipe with Woven geotextile fabric meeting: AASHTO #67 stone ASTM D4751 - AOS U.S. STD. sieve #50 to #70 ASTM D4633 - Min. trapezoidal tear strength 100 X 60 lbs, Minimum COE specified open area of 4% 6.0" 6.0" 1" Thick sand cushion layer 16 mil impermeable liner under all paved areas wrapped to top of pavement Schedule 40 HDPE 4" Under-drain Porous Asphalt Pavement Section
UDFCD BMP MONITORING SITES Porous Asphalt Pavement Installation Guidelines Design Thickness Asphalt Binder Design the thickness of the porous asphalt slab to have a finished thickness of 2.5 inches with a bituminous binder of 5.5% to 6.5% by weight dry aggregate. Use neat asphalt binder modified with an elastomeric polymer to produce a binder meeting the requirements of PG 76022. The elastomeric polymer shall be styrenebutadiene-styrene (SBS) or approved equivalent, applied at a rate of 3% by total weight of the binder. The composite materials shall be thoroughly blended at the asphalt refinery or terminal prior to being loaded into the transport vehicle. The polymer-modified asphalt binder shall be heat and storage stable. Aggregate Gradation Aggregate in the asphalt mix shall be a minimum 90% crushed material and have the following gradation: U.S. Standard Sieve Size Percent Passing 0.5-inch (12.5 mm) 100 0.375-inch (9.5 mm) 75-95 #4 (4.75 mm) 25-35 #8 (2.36 mm) 10-15 #16 (1.18 mm) 5-10 #30 (600 µm) 1-5 #200 (75 µm) 1-3 Batch Testing To test draindown, air voids and abrasion, prepare three batches containing asphalt binder contents of 5.5, 6.0 and 6.5 percent by dry weight aggregate. The asphalt content that provides the best results according to the following table shall be selected as the final mix. Test the final mix for Moisture Susceptibility and Resistance to Stripping. If the final mix does not meet the requirements for moisture susceptibility and resistance to stripping, add hydrated lime until the requirements are met.
- Page 2 and 3: UDFCD BMP MONITORING SITES Overview
- Page 4 and 5: UDFCD BMP MONITORING SITES Pervious
- Page 6 and 7: UDFCD BMP MONITORING SITES Pervious
- Page 8 and 9: UDFCD BMP MONITORING SITES Pervious
- Page 10 and 11: UDFCD BMP MONITORING SITES Pervious
- Page 12 and 13: UDFCD BMP MONITORING SITES Pervious
- Page 14 and 15: UDFCD BMP MONITORING SITES Pervious
- Page 16 and 17: UDFCD BMP MONITORING SITES Pervious
- Page 18 and 19: UDFCD BMP MONITORING SITES Pervious
- Page 20 and 21: UDFCD BMP MONITORING SITES Pervious
- Page 22 and 23: UDFCD BMP MONITORING SITES Porous A
- Page 26 and 27: UDFCD BMP MONITORING SITES Porous A
- Page 28 and 29: UDFCD BMP MONITORING SITES Porous A
- Page 30 and 31: UDFCD BMP MONITORING SITES Porous A
- Page 32 and 33: UDFCD BMP MONITORING SITES Porous A
- Page 34 and 35: UDFCD BMP MONITORING SITES Permeabl
- Page 36 and 37: UDFCD BMP MONITORING SITES Permeabl
- Page 38 and 39: UDFCD BMP MONITORING SITES Permeabl
- Page 40 and 41: UDFCD BMP MONITORING SITES Permeabl
- Page 42 and 43: UDFCD BMP MONITORING SITES Permeabl
- Page 44 and 45: UDFCD BMP MONITORING SITES Permeabl
- Page 46 and 47: UDFCD BMP MONITORING SITES Sand Fil
- Page 48 and 49: UDFCD BMP MONITORING SITES Open Bed
- Page 50 and 51: UDFCD BMP MONITORING SITES Open Bed
- Page 52 and 53: UDFCD BMP MONITORING SITES Open Bed
- Page 54 and 55: UDFCD BMP MONITORING SITES Open Bed
- Page 56 and 57: UDFCD BMP MONITORING SITES Open Bed
- Page 58 and 59: UDFCD BMP MONITORING SITES Open Bed
- Page 60 and 61: UDFCD BMP MONITORING SITES Orchard
- Page 62 and 63: UDFCD BMP MONITORING SITES Orchard
- Page 64 and 65: Orchard Pond EDB - Flow Dissipater
- Page 66 and 67: UDFCD BMP MONITORING SITES Orchard
- Page 68 and 69: UDFCD BMP MONITORING SITES Orchard
- Page 70 and 71: UDFCD BMP MONITORING SITES Orchard
- Page 72 and 73: UDFCD BMP MONITORING SITES Orchard
UDFCD <strong>BMP</strong> MONITORING SITES<br />
Porous Asphalt Pavement<br />
Typical Details<br />
5.0'<br />
20.0'<br />
92.0'<br />
20.0'<br />
TEMPORARY ORANGE FENCE<br />
POROUS<br />
ASPHALT<br />
25'<br />
18" RCP<br />
@ 1.0%<br />
INLETS:<br />
3.5' x 2.0'<br />
DWMD<br />
BUILDING<br />
CONVENTIONAL<br />
ASPHALT<br />
Porous Asphalt Pavement Plan<br />
AASHTO #67, all fractured<br />
faces; (CDOT SECT. 703-2,<br />
#67 course aggregate)<br />
Open-Graded HMA<br />
ASTM C-33 S<strong>and</strong><br />
Base Course: #3 Aggregate<br />
(CDOT Section 703-2)<br />
2% Min.<br />
18.0" Min.<br />
2.5"<br />
2.0"<br />
7.0"<br />
1.0"<br />
6.0"<br />
Fill under-drain trench<br />
around pipe with<br />
Woven geotextile fabric meeting:<br />
AASHTO #67 stone<br />
ASTM D4751 - AOS U.S. STD. sieve #50 to #70<br />
ASTM D4633 - Min. trapezoidal tear strength 100 X 60 lbs,<br />
Minimum COE specified open area of 4%<br />
6.0"<br />
6.0"<br />
1" Thick s<strong>and</strong><br />
cushion layer<br />
16 mil impermeable liner<br />
under all paved areas<br />
wrapped to top of pavement<br />
Schedule 40 HDPE<br />
4" Under-drain<br />
Porous Asphalt Pavement Section