14.10.2014 Views

BMP Monitoring Sites - Urban Drainage and Flood Control District

BMP Monitoring Sites - Urban Drainage and Flood Control District

BMP Monitoring Sites - Urban Drainage and Flood Control District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UDFCD <strong>BMP</strong> MONITORING SITES<br />

Porous Asphalt Pavement<br />

gravel, #3 gravel <strong>and</strong> C-33 s<strong>and</strong>. In a trench beneath the s<strong>and</strong>, a perforated pipe<br />

collects the filtered water <strong>and</strong> conveys it to a catch basin. There is an orifice<br />

plate at the end of the pipe where a pressure transducer measures the flow into<br />

the catch basin from the porous asphalt pavement. There is<br />

also a weir plate at the outlet of the catch basin with a<br />

levelogger that measures the flow leaving the catch basin.<br />

The difference between the flow passing the orifice plate <strong>and</strong><br />

the flow passing the weir plate is equal to the runoff that<br />

bypassed the porous asphalt pavement <strong>and</strong> entered the catch<br />

basin through the grate.<br />

The sampling equipment is stored in a metal box in the isl<strong>and</strong><br />

adjacent to the porous asphalt pavement. A rain gage on a post<br />

near the storage box measures rainfall <strong>and</strong> signals the ISCO<br />

sampler inside the box to begin sampling after 0.1 inches of rain<br />

falls. The sampler then draws a sample of water from the porous<br />

asphalt pavement runoff after a designated flow has passed, <strong>and</strong><br />

then every 15 minutes until 12 hours after the storm has ended.<br />

There is also a control watershed located a few hundred feet northeast of the<br />

porous asphalt pavement watershed. The control watershed consists primarily of<br />

traditional asphalt pavement <strong>and</strong> is used to compare results of treated runoff to<br />

untreated, direct runoff. Stormwater runoff from the control watershed is collected<br />

in a grated catch basin located in the northeast corner of the parking lot. The<br />

water leaves the catch basin by passing through a weir<br />

plate where a pressure transducer measures the flow.<br />

The sampling equipment is stored in a metal box<br />

adjacent to the parking lot in a manner similar to the<br />

porous asphalt pavement sampling configuration.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!