14.10.2014 Views

BMP Monitoring Sites - Urban Drainage and Flood Control District

BMP Monitoring Sites - Urban Drainage and Flood Control District

BMP Monitoring Sites - Urban Drainage and Flood Control District

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UDFCD <strong>BMP</strong> MONITORING SITES<br />

Pervious Concrete Pavement<br />

◊ Lmax = maximum distance between cut-off<br />

membrane normal to the flow (ft)<br />

◊ So = slope of the base course (ft/ft)<br />

◊ D = depth of gravel base course (ft)<br />

Subdrain System<br />

When the pervious concrete pavement is located on<br />

NRCS Type D soils, when the Type B or C soil sub-base<br />

is to be compacted for structural reasons, or when an<br />

impermeable membrane liner is needed, install a<br />

subdrain system using HDPE pipe. Locate each<br />

perforated pipe just upstream of the lateral-flow cut-off<br />

barrier. Do not exceed 20-foot spacing. Use a control<br />

orifice sized to drain the pore volume of empty each cell<br />

in 6 hours or more.<br />

Design Area Ratio The design area ratio shall not exceed 2.0 (ratio =<br />

And Effective contributing impervious area/pervious pavement area).<br />

Imperviousness The interim recommendations for effective<br />

imperviousness are given in the Manual.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!