14.10.2014 Views

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 2<br />

BMP Selection<br />

2.0 BMP Selection Tool<br />

To aid in selection of BMPs, UDFCD has developed a BMP selection tool (UD-BMP) to guide users of<br />

this manual through many of <strong>the</strong> considerations identified above and to determine what types of BMPs<br />

are most appropriate for a site. This tool helps to screen BMPs at <strong>the</strong> planning stages of development and<br />

can be used in conjunction with <strong>the</strong> BMP-REALCOST tool described in Section 4. Simplified schematics<br />

of <strong>the</strong> factors considered in <strong>the</strong> UD-BMP tool are provided in Figures 2-1, 2-2, and 2-3, which correspond<br />

to highly urbanized settings, conventional developments, and linear construction in urbanized areas.<br />

Separate figures are provided because each setting or type of development presents unique constraints.<br />

Highly urbanized sites are often lot-line to lot-line developments or redevelopments with greater than 90<br />

percent imperviousness with little room for BMPs. Linear construction typically refers to road and rail<br />

construction.<br />

Figure 2-1. BMP Decision Tree for Highly <strong>Urban</strong>ized Sites<br />

August 2011 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District 2-13<br />

<strong>Urban</strong> Storm <strong>Drainage</strong> <strong>Criteria</strong> <strong>Manual</strong> <strong>Volume</strong> 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!