EC-13 Streambank Stabilization (SS) found in the Major Drainage chapter of Volume 1 and additional guidance on BMPs for working in waterways can be found in UDFCD’s Best Management Practices for Construction in Waterways Training Manual. Maintenance and Removal Inspect BMPs protecting the stream for damage on a daily basis. Maintain, repair, or replace damaged BMPs following the guidance provided in individual BMP Fact Sheets for practices that are implemented. Some streambank stabilization BMPs are intended to remain in place as vegetation matures (e.g. erosion control blankets protecting seeded stream banks and turf reinforcement mats). For BMPs that are not to remain in place as a part of final stabilization such as silt fence and other temporary measures, BMPs should be removed when all land disturbing activities have ceased and areas have been permanently stabilized. SS-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3
Wind Erosion/Dust Control (DC) EC-14 Description Wind erosion and dust control BMPs help to keep soil particles from entering the air as a result of land disturbing construction activities. These BMPs include a variety of practices generally focused on either graded disturbed areas or construction roadways. For graded areas, practices such as seeding and mulching, use of soil binders, site watering, or other practices that provide prompt surface cover should be used. For construction roadways, road watering and stabilized surfaces should be considered. Appropriate Uses Photograph DC-1. Water truck used for dust suppression. Photo courtesy of Douglas County. Dust control measures should be used on any site where dust poses a problem to air quality. Dust control is important to control for the health of construction workers and surrounding waterbodies. Design and Installation The following construction BMPs can be used for dust control: • An irrigation/sprinkler system can be used to wet the top layer of disturbed soil to help keep dry soil particles from becoming airborne. • Seeding and mulching can be used to stabilize disturbed surfaces and reduce dust emissions. • Protecting existing vegetation can help to slow wind velocities across the ground surface, thereby limiting the likelihood of soil particles to become airborne. • Spray-on soil binders form a bond between soil particles keeping them grounded. Chemical treatments may require additional permitting requirements. Potential impacts to surrounding waterways and habitat must be considered prior to use. • Placing rock on construction roadways and entrances will help keep dust to a minimum across the construction site. • Wind fences can be installed on site to reduce wind speeds. Install fences perpendicular to the prevailing wind direction for maximum effectiveness. Maintenance and Removal When using an irrigation/sprinkler control system to aid in dust control, be careful not to overwater. Overwatering will cause construction vehicles to track mud off-site. Wind Erosion Control/ Dust Control Functions Erosion Control Sediment Control Site/Material Management Yes No Moderate November 2010 Urban Drainage and Flood Control District DC-1 Urban Storm Drainage Criteria Manual Volume 3
- Page 405 and 406: Temporary and Permanent Seeding (TS
- Page 407 and 408: Soil Binders (SB) EC-3 Description
- Page 409 and 410: Soil Binders (SB) EC-3 Factors to c
- Page 411 and 412: Soil Binders (SB) EC-3 Installation
- Page 413 and 414: Mulching (MU) EC-4 Description Mulc
- Page 415 and 416: Compost Blanket and Filter Berm (CB
- Page 417 and 418: Compost Blanket and Filter Berm (CB
- Page 419 and 420: Rolled Erosion Control Products (RE
- Page 421 and 422: Rolled Erosion Control Products (RE
- Page 423 and 424: Rolled Erosion Control Products (RE
- Page 425 and 426: Rolled Erosion Control Products (RE
- Page 427: Rolled Erosion Control Products (RE
- Page 430 and 431: EC-7 Temporary Slope Drains (TSD) M
- Page 432 and 433: EC-7 Temporary Slope Drains (TSD) S
- Page 434 and 435: EC-8 Temporary Outlet Protection (T
- Page 437 and 438: Rough Cut Street Control (RCS) EC-9
- Page 439: Rough Cut Street Control (RCS) EC-9
- Page 442 and 443: EC-10 Earth Dikes and Drainage Swal
- Page 444 and 445: EC-10 Earth Dikes and Drainage Swal
- Page 447 and 448: Terracing (TER) EC-11 Description T
- Page 449 and 450: Check Dams (CD) EC-12 Description C
- Page 451 and 452: Check Dams (CD) EC-12 November 2010
- Page 453 and 454: Check Dams (CD) EC-12 November 2010
- Page 455: Streambank Stabilization (SS) EC-13
- Page 460 and 461: MM-1 Concrete Washout Area (CWA) se
- Page 462 and 463: MM-1 Concrete Washout Area (CWA) CW
- Page 464 and 465: MM-2 Stockpile Management (SM) When
- Page 466 and 467: MM-2 Stockpile Management (SM) SP-4
- Page 468 and 469: MM-2 Stockpile Management (SM) SP-6
- Page 470 and 471: MM-3 Good Housekeeping Practices (G
- Page 472 and 473: MM-3 Good Housekeeping Practices (G
- Page 474 and 475: MM-3 Good Housekeeping Practices (G
- Page 476 and 477: SC-1 Silt Fence (SF) Maintenance an
- Page 478 and 479: SC-1 Silt Fence (SF) SF-4 Urban Dra
- Page 480 and 481: SC-2 Sediment Control Log (SCL) Alt
- Page 482 and 483: SC-2 Sediment Control Log (SCL) SCL
- Page 485 and 486: Straw Bale Barrier (SBB) SC-3 Descr
- Page 487: Straw Bale Barrier (SBB) SC-3 Novem
- Page 490 and 491: SC-4 Brush Barrier (BB) Maintenance
- Page 492 and 493: SC-5 Rock Sock (RS) RS-2 Urban Drai
- Page 495 and 496: Inlet Protection (IP) SC-6 Descript
- Page 497 and 498: Inlet Protection (IP) SC-6 • Remo
- Page 499 and 500: Inlet Protection (IP) SC-6 August 2
- Page 501 and 502: Inlet Protection (IP) SC-6 August 2
- Page 503 and 504: Sediment Basin (SB) SC-7 Descriptio
- Page 505 and 506: Sediment Basin (SB) SC-7 Illustrati
Wind Erosion/Dust Control (DC)<br />
EC-14<br />
Description<br />
Wind erosion and dust control BMPs<br />
help to keep soil particles from entering<br />
<strong>the</strong> air as a result of land disturbing<br />
construction activities. These BMPs<br />
include a variety of practices generally<br />
focused on ei<strong>the</strong>r graded disturbed areas<br />
or construction roadways. For graded<br />
areas, practices such as seeding and<br />
mulching, use of soil binders, site<br />
watering, or o<strong>the</strong>r practices that provide<br />
prompt surface cover should be used.<br />
For construction roadways, road<br />
watering and stabilized surfaces should<br />
be considered.<br />
Appropriate Uses<br />
Photograph DC-1. Water truck used for dust suppression. Photo<br />
courtesy of Douglas County.<br />
Dust control measures should be used on any site where dust poses a problem to air quality. Dust control<br />
is important to control for <strong>the</strong> health of construction workers and surrounding waterbodies.<br />
Design and Installation<br />
The following construction BMPs can be used for dust control:<br />
• An irrigation/sprinkler system can be used to wet <strong>the</strong> top layer of disturbed soil to help keep dry soil<br />
particles from becoming airborne.<br />
• Seeding and mulching can be used to stabilize disturbed surfaces and reduce dust emissions.<br />
• Protecting existing vegetation can help to slow wind velocities across <strong>the</strong> ground surface, <strong>the</strong>reby<br />
limiting <strong>the</strong> likelihood of soil particles to become airborne.<br />
• Spray-on soil binders form a bond between soil particles keeping <strong>the</strong>m grounded. Chemical<br />
treatments may require additional permitting requirements. Potential impacts to surrounding<br />
waterways and habitat must be considered prior to use.<br />
• Placing rock on construction roadways and entrances will help keep dust to a minimum across <strong>the</strong><br />
construction site.<br />
• Wind fences can be installed on site to reduce wind<br />
speeds. Install fences perpendicular to <strong>the</strong> prevailing<br />
wind direction for maximum effectiveness.<br />
Maintenance and Removal<br />
When using an irrigation/sprinkler control system to aid in<br />
dust control, be careful not to overwater. Overwatering will<br />
cause construction vehicles to track mud off-site.<br />
Wind Erosion Control/<br />
Dust Control<br />
Functions<br />
Erosion Control<br />
Sediment Control<br />
Site/Material Management<br />
Yes<br />
No<br />
Moderate<br />
November 2010 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District DC-1<br />
<strong>Urban</strong> Storm <strong>Drainage</strong> <strong>Criteria</strong> <strong>Manual</strong> <strong>Volume</strong> 3