EC-10 Earth Dikes and Drainage Swales (ED/DS) Unlined dikes or swales should only be used for intercepting sheet flow runoff and are not intended for diversion of concentrated flows. Details with notes are provided for several design variations, including: ED-1. Unlined Earth Dike formed by Berm DS-1. Unlined Excavated Swale DS-2. Unlined Swale Formed by Cut and Fill DS-3. ECB-lined Swale DS-4. Synthetic-lined Swale DS-5. Riprap-lined Swale The details also include guidance on permissible velocities for cohesive channels if unlined approaches will be used. Maintenance and Removal Inspect earth dikes for stability, compaction, and signs of erosion and repair. Inspect side slopes for erosion and damage to erosion control fabric. Stabilize slopes and repair fabric as necessary. If there is reoccurring extensive damage, consider installing rock check dams or lining the channel with riprap. If drainage swales are not permanent, remove dikes and fill channels when the upstream area is stabilized. Stabilize the fill or disturbed area immediately following removal by revegetation or other permanent stabilization method approved by the local jurisdiction. ED/DS-2 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3
Earth Dikes and Drainage Swales (ED/DS) EC-10 November 2010 Urban Drainage and Flood Control District ED/DS-3 Urban Storm Drainage Criteria Manual Volume 3
- Page 392 and 393: Construction BMP Plan Symbols MS-2
- Page 394 and 395: Construction BMP Plan Symbols MS-4
- Page 397 and 398: Surface Roughening (SR) EC-1 Descri
- Page 399 and 400: Surface Roughening (SR) EC-1 Novemb
- Page 401 and 402: Temporary and Permanent Seeding (TS
- Page 403 and 404: Temporary and Permanent Seeding (TS
- Page 405 and 406: Temporary and Permanent Seeding (TS
- Page 407 and 408: Soil Binders (SB) EC-3 Description
- Page 409 and 410: Soil Binders (SB) EC-3 Factors to c
- Page 411 and 412: Soil Binders (SB) EC-3 Installation
- Page 413 and 414: Mulching (MU) EC-4 Description Mulc
- Page 415 and 416: Compost Blanket and Filter Berm (CB
- Page 417 and 418: Compost Blanket and Filter Berm (CB
- Page 419 and 420: Rolled Erosion Control Products (RE
- Page 421 and 422: Rolled Erosion Control Products (RE
- Page 423 and 424: Rolled Erosion Control Products (RE
- Page 425 and 426: Rolled Erosion Control Products (RE
- Page 427: Rolled Erosion Control Products (RE
- Page 430 and 431: EC-7 Temporary Slope Drains (TSD) M
- Page 432 and 433: EC-7 Temporary Slope Drains (TSD) S
- Page 434 and 435: EC-8 Temporary Outlet Protection (T
- Page 437 and 438: Rough Cut Street Control (RCS) EC-9
- Page 439: Rough Cut Street Control (RCS) EC-9
- Page 444 and 445: EC-10 Earth Dikes and Drainage Swal
- Page 447 and 448: Terracing (TER) EC-11 Description T
- Page 449 and 450: Check Dams (CD) EC-12 Description C
- Page 451 and 452: Check Dams (CD) EC-12 November 2010
- Page 453 and 454: Check Dams (CD) EC-12 November 2010
- Page 455 and 456: Streambank Stabilization (SS) EC-13
- Page 457: Wind Erosion/Dust Control (DC) EC-1
- Page 460 and 461: MM-1 Concrete Washout Area (CWA) se
- Page 462 and 463: MM-1 Concrete Washout Area (CWA) CW
- Page 464 and 465: MM-2 Stockpile Management (SM) When
- Page 466 and 467: MM-2 Stockpile Management (SM) SP-4
- Page 468 and 469: MM-2 Stockpile Management (SM) SP-6
- Page 470 and 471: MM-3 Good Housekeeping Practices (G
- Page 472 and 473: MM-3 Good Housekeeping Practices (G
- Page 474 and 475: MM-3 Good Housekeeping Practices (G
- Page 476 and 477: SC-1 Silt Fence (SF) Maintenance an
- Page 478 and 479: SC-1 Silt Fence (SF) SF-4 Urban Dra
- Page 480 and 481: SC-2 Sediment Control Log (SCL) Alt
- Page 482 and 483: SC-2 Sediment Control Log (SCL) SCL
- Page 485 and 486: Straw Bale Barrier (SBB) SC-3 Descr
- Page 487: Straw Bale Barrier (SBB) SC-3 Novem
- Page 490 and 491: SC-4 Brush Barrier (BB) Maintenance
Earth Dikes and <strong>Drainage</strong> Swales (ED/DS)<br />
EC-10<br />
November 2010 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District ED/DS-3<br />
<strong>Urban</strong> Storm <strong>Drainage</strong> <strong>Criteria</strong> <strong>Manual</strong> <strong>Volume</strong> 3