14.10.2014 Views

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Construction BMPs<br />

Construction BMPs<br />

8. Routine maintenance activities involving fertilizers, pesticides, detergents, fuels, solvents,<br />

oils, etc.;<br />

9. On-site waste management practices (waste piles, liquid wastes, dumpsters, etc.);<br />

10. Concrete truck/equipment washing, including <strong>the</strong> concrete truck chute and associated fixtures<br />

and equipment;<br />

11. Dedicated asphalt and concrete batch plants;<br />

12. Non-industrial waste sources such as worker trash and portable toilets; and<br />

13. O<strong>the</strong>r areas or procedures where potential spills can occur.<br />

• BMPs for Construction Stormwater Pollution Prevention. Identify and describe appropriate<br />

BMPs including those listed in this section. Provide enough detail for each BMP to ensure proper<br />

implementation, operation, and maintenance.<br />

o<br />

o<br />

o<br />

o<br />

o<br />

o<br />

o<br />

o<br />

Structural Practices for Erosion and Sediment Control. (e.g., wattles/sediment control logs and<br />

temporary or permanent sediment basins).<br />

Non-Structural Practices for Erosion and Sediment Control. (e.g., temporary vegetation and<br />

permanent vegetation).<br />

Phased BMP Implementation. Describe <strong>the</strong> relationship between <strong>the</strong> phases of construction, and<br />

<strong>the</strong> implementation and maintenance of both structural and non-structural stormwater<br />

management controls. Project phases might include different operations such as clearing and<br />

grubbing; road construction; utility and infrastructure installation; vertical construction; final<br />

grading; and final stabilization.<br />

Materials Handling and Spill Prevention. Materials of interest could include: exposed storage of<br />

building materials; paints and solvents; fertilizers or chemicals; waste material; and equipment<br />

maintenance or fueling procedures.<br />

Dedicated Concrete or Asphalt Batch Plants.<br />

Vehicle Tracking Control. This BMP includes minimizing (as practicable) <strong>the</strong> number of areas<br />

where construction vehicles are required to move from unpaved to paved areas as well as<br />

providing structural BMPs at each location.<br />

Waste Management and Disposal, Including Concrete Washout.<br />

Groundwater and Stormwater Dewatering. These activities often require a separate permit that<br />

includes sampling of processed waters. However, in some cases, <strong>the</strong>se activities can be<br />

conducted without a separate permit when processed water is not discharged from <strong>the</strong> site as<br />

surface runoff or discharged into surface waters. The SWMP should describe how <strong>the</strong>se waters<br />

will be used (i.e., land application, infiltration, evaporation) and how <strong>the</strong> specific practices at <strong>the</strong><br />

site will ensure that <strong>the</strong>se waters are not discharged via runoff.<br />

7-8 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District November 2010<br />

<strong>Urban</strong> Storm <strong>Drainage</strong> <strong>Criteria</strong> <strong>Manual</strong> <strong>Volume</strong> 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!