BMP Maintenance Chapter 6 • Filter Cartridges: Inspection of filter cartridges is recommended twice yearly. Replacement of filter cartridges is anticipated on an annual basis. Depending on site characteristics, the replacement frequency may be extended to no less than once every three years. However, semi-annual inspection should continue to ensure that proper function of the system is maintained. Maintenance is required when any of the following conditions exist: o o o o o o o o If there is more than 4 inches of accumulated sediment on the vault floor. If there is more than ¼ inch of accumulation on the top of the cartridge. If there is more than 4 inches of standing water in the cartridge bay for more than 24 hours after the end of a rain event. If the pore space between media granules is full. If inspection is conducted during an average rainfall event and the system remains in bypass condition (water over the internal outlet baffle wall or submerged cartridges). If hazardous material release (automotive fluids or other) is reported. If pronounced scum line (≥ 1/4" thick) is present above top cap. If system has not been maintained for three years. • Hydrodynamic Separators: Vacuum units at least once annually and more frequently as needed, based on inspections. 13.0 References CONTECH Stormwater Solutions. 2007. StormFilter Inspection and Maintenance Procedures. www.contech-cpi.org. Koski, T. and Skinner, V. 2003. Colorado State University Extension. Fact Sheet no.7.202, Lawn Care. http://www.ext.colostate.edu/pubs/garden/07202.html. Law, N.L., K. DiBlasi, and U. Ghosh. 2008. Deriving Reliable Pollutant Removal Rates for Municipal Street Sweeping and Storm Drain Cleanout Programs in the Chesapeake Bay Basin. Center for Watershed Protection. Prepared for U.S. EPA Chesapeake Bay Program Grant CB-973222-01: Ellicott City, MD. www.cpw.org. Wright Water Engineers, Inc., Wenk Associates, Muller Engineering Company, Inc., Matrix Design Group, and Smith Environmental. 2004. City and County of Denver Water Quality Management Plan. Denver, CO 6-18 Urban Drainage and Flood Control District November 2010 Urban Storm Drainage Criteria Manual Volume 3

Chapter 7 Construction BMPs Contents 1.0 Introduction ...................................................................................................................................... 1 2.0 Fundamental Erosion and Sediment Control Principles .............................................................. 2 2.1 Erosion ...................................................................................................................................................... 2 2.2 Sedimentation ............................................................................................................................................ 3 2.3 Effective Erosion and Sediment Control ................................................................................................... 3 3.0 Colorado Construction Stormwater Discharge Permits ............................................................... 4 3.1 Preparing and Implementing a Stormwater Management Plan (SWMP) .................................................. 5 3.1.1 General SWMP Recommendations ............................................................................................... 6 3.1.2 SWMP Elements ........................................................................................................................... 6 3.2 Inspections ................................................................................................................................................ 9 3.2.1 Inspection Frequency .................................................................................................................... 9 3.2.2 Inspection Records ...................................................................................................................... 10 3.3 Maintenance ............................................................................................................................................ 10 3.4 Disposition of Temporary Measures ....................................................................................................... 10 3.5 2009 Federal Effluent Limitation Guidelines .......................................................................................... 11 4.0 Overview of Construction BMPs .................................................................................................. 11 4.1 Erosion Control Measures ....................................................................................................................... 15 4.2 Sediment Control Measures .................................................................................................................... 15 4.3 Site Management ..................................................................................................................................... 16 4.4 Materials Management ............................................................................................................................ 17 4.5 Proprietary BMPs .................................................................................................................................... 17 5.0 BMP Selection and Planning ......................................................................................................... 18 5.1 Site Assessment ....................................................................................................................................... 18 5.2 Slope-Length and Runoff Considerations ............................................................................................... 20 5.3 Using the Revised Universal Soil Loss Equation .................................................................................... 21 5.4 BMP Functions ....................................................................................................................................... 22 5.5 Consistency with Other Plans ................................................................................................................. 22 5.5.1 Drainage Plans ............................................................................................................................ 22 5.5.2 Post Construction Stormwater Management ............................................................................... 22 5.5.3 Air Quality Plans ......................................................................................................................... 23 5.6 Guidelines for Integrating Site Conditions and BMPs into a SWMP...................................................... 23 6.0 Construction Dewatering ............................................................................................................... 24 7.0 Construction in Waterways ........................................................................................................... 24 8.0 Considerations for Linear Construction Projects ....................................................................... 27 8.1 General Considerations ........................................................................................................................... 27 8.2 Underground Utility Trenching Criteria .................................................................................................. 28 9.0 References ....................................................................................................................................... 29 November 2010 Urban Drainage and Flood Control District 7-i Urban Storm Drainage Criteria Manual Volume 3

Chapter 7<br />

Construction BMPs<br />

Contents<br />

1.0 Introduction ...................................................................................................................................... 1<br />

2.0 Fundamental Erosion and Sediment Control Principles .............................................................. 2<br />

2.1 Erosion ...................................................................................................................................................... 2<br />

2.2 Sedimentation ............................................................................................................................................ 3<br />

2.3 Effective Erosion and Sediment Control ................................................................................................... 3<br />

3.0 Colorado Construction Stormwater Discharge Permits ............................................................... 4<br />

3.1 Preparing and Implementing a Stormwater Management Plan (SWMP) .................................................. 5<br />

3.1.1 General SWMP Recommendations ............................................................................................... 6<br />

3.1.2 SWMP Elements ........................................................................................................................... 6<br />

3.2 Inspections ................................................................................................................................................ 9<br />

3.2.1 Inspection Frequency .................................................................................................................... 9<br />

3.2.2 Inspection Records ...................................................................................................................... 10<br />

3.3 Maintenance ............................................................................................................................................ 10<br />

3.4 Disposition of Temporary Measures ....................................................................................................... 10<br />

3.5 2009 Federal Effluent Limitation Guidelines .......................................................................................... 11<br />

4.0 Overview of Construction BMPs .................................................................................................. 11<br />

4.1 Erosion Control Measures ....................................................................................................................... 15<br />

4.2 Sediment Control Measures .................................................................................................................... 15<br />

4.3 Site Management ..................................................................................................................................... 16<br />

4.4 Materials Management ............................................................................................................................ 17<br />

4.5 Proprietary BMPs .................................................................................................................................... 17<br />

5.0 BMP Selection and Planning ......................................................................................................... 18<br />

5.1 Site Assessment ....................................................................................................................................... 18<br />

5.2 Slope-Length and Runoff Considerations ............................................................................................... 20<br />

5.3 Using <strong>the</strong> Revised Universal Soil Loss Equation .................................................................................... 21<br />

5.4 BMP Functions ....................................................................................................................................... 22<br />

5.5 Consistency with O<strong>the</strong>r Plans ................................................................................................................. 22<br />

5.5.1 <strong>Drainage</strong> Plans ............................................................................................................................ 22<br />

5.5.2 Post Construction Stormwater Management ............................................................................... 22<br />

5.5.3 Air Quality Plans ......................................................................................................................... 23<br />

5.6 Guidelines for Integrating Site Conditions and BMPs into a SWMP...................................................... 23<br />

6.0 Construction Dewatering ............................................................................................................... 24<br />

7.0 Construction in Waterways ........................................................................................................... 24<br />

8.0 Considerations for Linear Construction Projects ....................................................................... 27<br />

8.1 General Considerations ........................................................................................................................... 27<br />

8.2 Underground Utility Trenching <strong>Criteria</strong> .................................................................................................. 28<br />

9.0 References ....................................................................................................................................... 29<br />

November 2010 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District 7-i<br />