14.10.2014 Views

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T-11 Underground BMPs<br />

For <strong>the</strong>se reasons, it is important to discuss <strong>the</strong> installation of <strong>the</strong> underground BMP with <strong>the</strong><br />

manufacturer prior to selecting a contractor so that <strong>the</strong> installation requirements are clearly understood.<br />

Construction observation by <strong>the</strong> design engineer, and, if possible, a manufacturer's representative is<br />

essential for proper installation. At a minimum, <strong>the</strong> installation should be inspected by <strong>the</strong> manufacturer's<br />

representative once completed. Any deficiencies of <strong>the</strong> installation identified by <strong>the</strong> manufacturer's<br />

inspection should be corrected immediately.<br />

UG-10 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District June 2012<br />

<strong>Urban</strong> Storm <strong>Drainage</strong> <strong>Criteria</strong> <strong>Manual</strong> <strong>Volume</strong> 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!