14.10.2014 Views

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

T-7 Retention Pond<br />

13. Access: All wea<strong>the</strong>r stable access to <strong>the</strong> bottom, forebay, and outlet works area should be provided<br />

for maintenance vehicles. Grades should not exceed 10% for haul road surfaces and should not<br />

exceed 20% for skid-loader and backhoe access. Provide a solid driving surface such as gravel,<br />

concrete, articulated concrete block, concrete grid pavement, or reinforced grass pavement. The<br />

recommended cross slope is 2%.<br />

Figure RP-1. Retention Pond Plan and Sections<br />

RP-6 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District November 2010<br />

<strong>Urban</strong> Storm <strong>Drainage</strong> <strong>Criteria</strong> <strong>Manual</strong> <strong>Volume</strong> 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!