14.10.2014 Views

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Extended Detention Basin (EDB) T-5<br />

Designer:<br />

Company:<br />

Date:<br />

Project:<br />

Location:<br />

H. Dauel<br />

BMP, Inc.<br />

November 29, 2010<br />

Subdivison D<br />

NE Corner of 34th Ave. and 83rd St.<br />

Design Procedure Form: Extended Detention Basin (EDB)<br />

Sheet 3 of 4<br />

8. Initial Surcharge <strong>Volume</strong><br />

A) Depth of Initial Surcharge <strong>Volume</strong> D IS = 6.0 in<br />

(Minimum recommended depth is 4 inches)<br />

B) Minimum Initial Surcharge <strong>Volume</strong> V IS = 55.5 cu ft<br />

(Minimum volume of 0.3% of <strong>the</strong> WQCV)<br />

C) Initial Surcharge Provided Above Micropool V s = 62.5 cu ft<br />

9. Trash Rack<br />

A) Type of Water Quality Orifice Used<br />

Choose One<br />

Circular (up to 2" diameter)<br />

Rectangular (2" high)<br />

B) Water Quality Screen Open Area: A t = 38.5*(e -0.095D )*A ot<br />

A t = 317 square inches<br />

C) For 2", or Smaller, Circular Opening (See Fact Sheet T-12):<br />

i) Width of Water Quality Screen and Concrete Opening (W opening ) W opening = 12.0 inches<br />

ii) Height of Water Quality Screen (H TR ) H TR = 55.6 inches<br />

iii) Type of Screen, Describe if "O<strong>the</strong>r"<br />

Choose One<br />

S.S. Well Screen with 60% Open Area*<br />

O<strong>the</strong>r (Describe):<br />

D) For 2" High Rectangular Opening:<br />

i) Width of Rectangular Opening (W orifice ) W = inches<br />

ii) Width of Water Quality Screen Opening (W opening ) W opening = ft<br />

iii) Height of Water Quality Screen (H TR ) H TR = ft<br />

iv) Type of Screen, Describe if "O<strong>the</strong>r"<br />

Choose One<br />

Aluminum Amico-Klemp SR Series (or equal)<br />

O<strong>the</strong>r (Describe):<br />

v) Cross-bar Spacing inches<br />

vi) Minimum Bearing Bar Size<br />

December 2010 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District EDB-15<br />

<strong>Urban</strong> Storm <strong>Drainage</strong> <strong>Criteria</strong> <strong>Manual</strong> <strong>Volume</strong> 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!