14.10.2014 Views

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

Download the entire Volume 3 Criteria Manual - Urban Drainage ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

T-5 Extended Detention Basin (EDB)<br />

Designer:<br />

Company:<br />

Date:<br />

Project:<br />

Location:<br />

Design Procedure Form: Extended Detention Basin (EDB)<br />

H. Dauel<br />

BMP, Inc.<br />

November 29, 2010<br />

Subdivison D<br />

NE Corner of 34th Ave. and 83rd St.<br />

Sheet 2 of 4<br />

5. Forebay<br />

A) Minimum Forebay <strong>Volume</strong> V FMIN = 0.013 ac-ft<br />

(V FMIN = 3% of <strong>the</strong> WQCV)<br />

B) Actual Forebay <strong>Volume</strong> V F = 0.015 ac-ft<br />

C) Forebay Depth D F = 12.0 in<br />

(D F = 18 inch maximum)<br />

D) Forebay Discharge<br />

i) Undetained 100-year Peak Discharge Q 100 = 50.00 cfs<br />

ii) Forebay Discharge Design Flow Q F = 1.00 cfs<br />

(Q F = 0.02 * Q 100 )<br />

E) Forebay Discharge Design<br />

Choose One<br />

Berm With Pipe<br />

Wall with Rect. Notch<br />

Wall with V-Notch Weir<br />

(flow too small for berm w/ pipe)<br />

F) Discharge Pipe Size (minimum 8-inches) Calculated D P = in<br />

G) Rectangular Notch Width Calculated W N = 6.0 in<br />

6. Trickle Channel<br />

A) Type of Trickle Channel<br />

Choose One<br />

Concrete<br />

Soft Bottom<br />

F) Slope of Trickle Channel S = 0.0100 ft / ft<br />

7. Micropool and Outlet Structure<br />

A) Depth of Micropool (2.5-feet minimum) D M = 2.5 ft<br />

B) Surface Area of Micropool (10 ft 2 minimum) A M = 125 sq ft<br />

C) Outlet Type<br />

Choose One<br />

Orifice Plate<br />

O<strong>the</strong>r (Describe):<br />

D) Depth of Design <strong>Volume</strong> (EURV or 1.2 WQCV) Based on <strong>the</strong> Design H = 2.30 feet<br />

Concept Chosen Under 1.E.<br />

E) <strong>Volume</strong> to Drain Over Prescribed Time EURV = 1.277 ac-ft<br />

F) Drain Time T D = 72 hours<br />

(Min T D for WQCV= 40 hours; Max T D for EURV= 72 hours)<br />

G) Recommended Maximum Outlet Area per Row, (A o ) A o = 1.3 square inches<br />

H) Orifice Dimensions:<br />

i) Circular Orifice Diameter or D orifice = 1 - 5 / 16 inch inches<br />

ii) Width of 2" High Rectangular Orifice W orifice = inches<br />

I) Number of Columns n c = 1 number<br />

J) Actual Design Outlet Area per Row (A o ) A o = 1.4 square inches<br />

K) Number of Rows (nr) n r = 6 number<br />

L) Total Outlet Area (A ot ) A ot = 9.3 square inches<br />

M) Depth of WQCV (H WQCV ) H WQCV = 0.8 feet<br />

(Estimate using actual stage-area-volume relationship and V WQCV )<br />

N) Ensure Minimum 40 Hour Drain Time for WQCV T D WQCV = 49.7 hours<br />

EDB-14 <strong>Urban</strong> <strong>Drainage</strong> and Flood Control District December 2010<br />

<strong>Urban</strong> Storm <strong>Drainage</strong> <strong>Criteria</strong> <strong>Manual</strong> <strong>Volume</strong> 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!